156 Burton Street
●
Painesville,
Ohio
●
USA
●
1.800.989.DOCKS (3625)
440.286.7135
●
Fax: 440.286.7134
●
Step #6 -
Install the bottom of the
Front Cantilever Post Frame
:
1
1260-01
Cantilever Post Frame, 36”H, Front (1200-056).
Position with drilled U-Bolt holes at top. Use these fasteners:
2
3706-06
1/2-13" x 5-3/4" Hex Head C/S ZY
2
3706-08
1/2-13" Nylon Insert Locknut ZY
Do not tighten Bolts -- leave loose until Lift is fully assembled.
Step #7 -
Install the bottom of the
Rear Cantilever Post Frame
:
1
1265-01
Cantilever Post Frame, 36”H, Rear (1200-056).
Use these fasteners:
2
2
3706-07
1/2-13" x 6" Hex Head C/S ZY
3706-08
1/2-13" Nylon Insert Locknut ZY
Do not tighten Bolts -- leave loose until Lift is fully assembled.
Step #8 -
Install the
Cantilever Assembly
on top of the two Cantilever Posts installed in Steps #5
and #6 (note: drain holes are on bottom):
1
1270-01
Cradle Assembly Top (1200-056).
Position Cantilever Assembly with drain holes down. Use these fasteners:
4
3706-07
1/2-13" x 6" Hex Head C/S ZY
4
3706-08
1/2-13" Nylon Insert Locknut ZY
Do not tighten Bolts -- leave loose until Lift is fully assembled.
Step #9 -
Tighten Bolts
in the following order:
P
Bottom Frame.
P
Gusset Braces.
P
Legs.
P
Lower Cantilever Post Hinges (snug only - do not over tighten or hinges will bind).
P
Upper Cantilever Post Hinges (snug only - do not over tighten or hinges will bind).