9
Working speed
km/h
8-13
10
Efficiency
ha/h
3.0-5.0
11
Power demand
HP
kW
110-130
81-96
12
Operation
persons
operator
13
Dimensions
Length/Width/Height
mm
2765/1380/3430
14
Weight /with packer/
kg
1800
15
Hitch category
-
3
7.
DELIVERY
AND LOADING ON MEANS OF TRANSPORT
The machine is supplied to the user partially disassembled. How much the machine is
disassembled depends on the used mean of transport. While loading and unloading the machine,
parts of the frame indicated as lifting points with appropriate pictograms should be used for lifting
the machine see section 3.4.
8.
OPERATION AND USE
8.1
PREPARATION OF THE MACHINE
While preparing the machine to work it is required to check its technical condition, most
importantly the condition of the working elements.
In addition it is required to:
•
check the condition of the bolted joints,
•
check the folding and unfolding of the machine,
•
check the condition of the hydraulic lines and actuators - whether there are any leaks,
•
check whether the discs and packer rotate freely by rotating them by hand,
•
lubricate the elements of the machine in accordance with the guidelines specified
in section 8.5.
The machine's hydraulic system is filled with Renolin VG46 hydraulic fluid manufactured
by FUCHS. It is allowed to mix it with the hydraulic liquid with the oil from the tractor's hydraulic
system.
8.2
COUPLING THE MACHINE TO THE TRACTOR
To safely and securely couple the machine to the tractor it should be placed on a firm and
level ground.
To couple the machine to the tractor it is required to perform the following actions:
•
reverse the tractor to a distance which allows to couple the machine with the tractor's lower
hitch,
•
attach the upper hitch of the 3 point hitch to the machine and remove any play,
•
attach the hydraulic lines of the machine to the tractor's external hydraulic system,
•
raise the machine,
•
check the leaktightness of the machine's hydraulic system, the hydraulic lines may not be
bent or damaged,
13