METAL-FACH
Heating Technology
4
General information
(User)
The Operation and Technical Manual is one of the product parts which are supplied together with the purchased
central heating boiler. The Operation and Technical Manual includes data concerning the construction and
installation as well as the method of operation of boilers with a self-cleaning pellet burner of the GRAND PELLET
series. Careful reading of this manual ensures correct and safe operation of our boiler.
NOTE!
The user is advised to observe all instructions regarding the appliance contained in this
Operation and Maintenance Manual, the Warranty Conditions and the generally applicable
legal provisions.
The boilers are delivered in an assembled condition. They are set up and fixed permanently to a pallet.
Additional protection in the form of foil packaging is used.
When transporting the boiler, it is necessary to secure it against shifting or rotation on the truck body by means
of securing devices, e.g. belts. The transport of boilers should be carried out in accordance with the rules
concerning the transport of materials. Loading and unloading should be carried out with lifting devices (forklift)
with a lifting capacity of more than 1000 kg.
Содержание GRAND PELLET 100
Страница 1: ......
Страница 2: ......
Страница 10: ...METAL FACH Heating Technology 8 Boiler GRAND PELLET 15 34 ...
Страница 12: ...METAL FACH Heating Technology 10 Boiler GRAND PELLET 50 150 ...
Страница 42: ...METAL FACH Heating Technology 40 ...
Страница 48: ...METAL FACH Heating Technology 46 ...
Страница 50: ...METAL FACH Heating Technology 48 ...
Страница 52: ...METAL FACH Heating Technology 50 ...
Страница 59: ......
Страница 60: ......