6
Step 8b.
Measure from the top of the support bar ferrule
V6S6SW05
to the ceiling and
. Cut the
vertical support bar
V1120
to this length.
subtract 1cm
NOTE: Do not cut end with internal thread on
V1120.
Step 9b.
Screw the support bar
V1120
to the ferrule
V6S6SW05
with the ceiling mount
V6S6SW07A
loose in the top. Ensure the support bar is plumb vertical and mark the
position for the mount on the ceiling. Remove the bar and fix the mount to the ceiling
using plugs
and screws
.
V8125
V4115
.
THE CEILING MOUNT MUST BE SECURED
TO A JOIST OR OTHER SOLID COMPONENT
Step 10b.
Slide the cover sleeve
over
the bar and insert the bar into the
ceiling mount
V6S6SW07A
. Screw
the bar down onto the support ferrule
V6S6SW05
. Tighten the grub screws
in the ceiling mount.
V8118
Step 12b.
Screw the cover sleeve
up onto
the ceiling mount over the secured
support bar.
V8118
V6S6SW07A
V4115
V8125
V8118
9b
12b
8b
MEASURE
OPTION 2
-
VERTICAL
FITTING
TOP RAIL
V1120
10b
V8124
11b
Step 11b.
Tighten
the
screw
V6M5
V8124
.
X5
using
TIGHTEN
V6M5X5