
Section 6 - Storage
Page 70
90-8M0061999
eng
MAY 2012
14. Before launching the boat, pull up on the manual release valve. Verify that the green indicators are no longer extended.
a -
Manual release valve pull ring
b -
Threaded cap on air connection
c -
Green indicators
15. Open the seacock, if equipped, or unplug and reconnect the water inlet hose prior to operating the engine.
Boat Out of the Water
NOTE: This procedure is written for the air pump that is attached to the engine. However, any air source can be used.
1. Place the boat on a level surface and ensure the boat is level.
2. Obtain the air pump.
3. Ensure that the lever on top of the pump is flush with the handle (horizontal).
4. Install the air pump on the air connection.
a -
Lever
b -
Air pump
c -
Air connection
5. Pull the lever on the air pump (vertical) to seal the pump to the air connection.
6. Pump air into the system until both green indicators extend and water drains from both sides of the engine. The port side
will begin draining before the starboard side.
a -
Manual release valve
b -
Air pump lever (locked)
c -
Air connection
d -
Green indicators extended
a
b
43558
cc
43077
c
a
b
a
b
c
d
d
43557
Содержание 8.2 H.O. ECT
Страница 8: ...Page iv 90 8M0061999 eng MAY 2012...
Страница 40: ...Section 2 Getting to Know Your Power Package Notes Page 32 90 8M0061999 eng MAY 2012...
Страница 72: ...Section 5 Maintenance Notes Page 64 90 8M0061999 eng MAY 2012...
Страница 82: ...Section 6 Storage Notes Page 74 90 8M0061999 eng MAY 2012...