2. Attach a water hose to the flushing attachment. Turn on the water and
adjust the flow so water is leaking around the rubber cups to ensure the
engine receives an adequate supply of cooling water.
27259
3. Start the engine and run it at idle speed in neutral shift position.
IMPORTANT: Do not run engine above idle when flushing.
4. Adjust water flow (if necessary) so excess water continues leaking out
from around the rubber cups to ensure the engine is receiving an
adequate supply of cooling water.
27260
5. Check for a steady stream of water flowing out of the water pump
indicator hole. Continue flushing the outboard for 3 to 5 minutes, carefully
monitoring water supply at all times.
6. Stop the engine, turn off the water, and remove the flushing attachment.
Install the propeller.
Cowl Removal and Installation
REMOVAL
1. Release the rear latch.
MAINTENANCE
82
eng
Содержание 10 FOURSTROKE
Страница 2: ...eng ...
Страница 87: ...7 Pull the starter rope quickly OPERATION eng 77 ...