background image

K  Conveyor Chain

(Figure 8)

1.

With outer case removed (Section A),
loosen motor mounting bracket retain-
ing bolts on underside of unit, and slide
motor to the left.

2.

Loosen rear shaft adjusting bracket
nuts and bearing retaining bracket nuts
on both sides of unit.

3.

Slide rear conveyor shaft forward to
loosen tension.

4.

Separate the chain at any link and slide
out from front of unit.

5.

Before installing new chain, check for
proper orientation (See Figure 8), and
correct number of links.

6.

Starting at front of unit, slide chain
under front shaft and push towards rear
of unit.  Bring chain up and over rear
shaft assembly and pull towards front.
Connect links.

  

CAUTION:  MAKE

SURE CHAIN IS NOT INSTALLED AT
AN ANGLE.

7.

Push back on rear shaft assembly until excess
slack is removed from chain.  Holding tension,
tighten both the rear shaft adjusting brackets and
bearing retaining brackets on both sides of unit.

8.

Check for proper tension.  There should be
approximately 3/8” to ¾” space between the
conveyor chain and the ledge on the inside of the
unit cavity.

9.

Slide motor to the right to tighten drive chain
tension.  There should be approximately ¼” play
in the drive chain.

10. Tighten motor mounting bracket retaining bolts on

underside of unit.

4

Содержание RT-2AR

Страница 1: ...side 12219 1 Legs 1 plastic 12668 4 Control panel 12060 1 Control panel decal 12061 1 Savory logo 12523 1 Savory lubricant 21720 1 PARTS SERVICE MANUAL for RT 2AR Adjustable Range Toaster The information found in this Manual will prove very helpful Although the instructions are easy to follow all repair procedures should be carried out by a qualified Merco Savory Certified Service Representative T...

Страница 2: ...ppropriate wiring diagram NOTE The two 2 infinite controls on the RT 2AR model serve as on off switches to the heating ele ments The upper infinite knob controls the upper elements and the lower infinite knob controls the lower heating elements F Speed Control P C Board As sembly NOTE The speed control and P C board are wired together and must be replaced as an assembly 1 With control panel remove...

Страница 3: ...ring diagram H Drive Chain 1 With outer case removed Section A loosen the 2 motor mounting bracket retaining bolts on underside of unit but do NOT remove 2 Slide motor to the left to loosen drive chain tension 3 Remove drive chain 4 Install new chain over sprockets with open looped side of chain facing out 5 Slide motor to right to tighten drive chain tension There should be approximately plat in ...

Страница 4: ...e chain under front shaft and push towards rear of unit Bring chain up and over rear shaft assembly and pull towards front Connect links CAUTION MAKE SURE CHAIN IS NOT INSTALLED AT AN ANGLE 7 Push back on rear shaft assembly until excess slack is removed from chain Holding tension tighten both the rear shaft adjusting brackets and bearing retaining brackets on both sides of unit 8 Check for proper...

Страница 5: ...haft sprocket Section J 6 Remove bearing retainer brackets at both sides of unit and slide bearings out Shaft can be replaced at this time if needed Note proper orientation of hex head spacers 7 Replace bearings and rear shaft if neces sary shaft sprockets and drive chain Section H 8 Replace conveyor chain Section K M Power On Light 1 With control panel removed Section A disconnect wire leads from...

Страница 6: ...6 ...

Страница 7: ...7 ...

Страница 8: ...8 1111 N Hadley Rd Fort Wayne In 46804 Tel 800 701 2992 Fax 260 436 0735 www mercosavory com ...

Отзывы: