background image

F  Terminal Block

(Figure 2)

1.

Remove right side panel and bottom cover.

2.

Remove the wires at the terminal ends,
noting proper wire orientation.

3.

Remove the 2 nuts securing the terminal
block to the wall of the toaster.

4.

Reverse this procedure to install new
terminal block.  (Refer to wiring diagram)

G Gearmotor and Motor

Sprocket

(Figure 2 & 3)

1.

Remove right side panel and bottom cover.
(Section A)

2.

Loosen the 4 motor mounting screws and
slide motor to achieve slack in the drive
chain.

3.

Loosen set screw on motor sprocket and
remove sprocket.

4.

Remove the 4 mounting screws and lift out
motor.

5.

Disconnect 2 wire leads from motor, one at
the wire connector and the other at the
terminal block.

6.

Reverse this procedure to install the new
motor.  (Refer to wiring diagram)

H  Drive Chain

(Figure 3, 5 & 6)

1.

Remove right side panel.  (Section A)

2.

Loosen, but do NOT remove the 4 mounting
screws.  Slide motor to achieve slack in
drive chain and remove chain.

3.

When installing new chain, check for proper
chain orientation and tension.

I  Conveyor Shaft Sprocket

(Figure 3, 5 & 6)

1.

Remove right side panel.  (Section A)

2.

Remove drive chain.  (Section H)

3.

Loosen set screw on hub of sprocket and
slide sprocket off shaft.

4.

When installing new sprocket, make sure set
screw rests in hole of shaft.

5.

Replace drive chain.  (Section H)

J  Conveyor Belt

(Figure 3, 4 & 7)

1.

Remove right and left side panels.  (Section
A)

2.

Loosen, but do NOT remove the bearing
retainer brackets on both sides of the toaster.

3.

Loosen, but do NOT remove the tension
adjusting brackets on both sides of the
toaster.

4.

Push front conveyor shaft towards the back of
the toaster to loosen belt tension.

5.

Separate the conveyor belt at any link and
slide out of toaster.

6.

When installing new conveyor belt, check for
proper link orientation.  (Figure 6)

7.

Starting at front of toaster, slide belt under
front shaft and push towards rear of unit.
Bring belt up and over the rear shaft and pull
towards front of toaster.  Make sure belt is
resting on both belt support guides.  Recon-
nect links.  CAUTION:  Make sure belt is not
installed at an angle.

8.

Pull  forward on front conveyor shaft until
excess slack is removed.

9.

Tighten tension adjusting brackets and
bearing retainer brackets on both sides of
toaster.

4

Содержание BT-1

Страница 1: ...ocedures should be carried out by a qualified Merco Savory Certified Service Repre sentative The savory BT 1 compact bagel toaster brings the advantages of conveyor style toasting to your lower volume needs The BT 1 is designed to toast the product on the top side only The heater control knob and the conveyor speed knob enable the operator to adjust to the desired toasting requirements The BT 1 ca...

Страница 2: ...k of the unit Remove this screw and slide out the panel When replacing either panel be sure that the panel is properly positioned in the securing track 2 The top cover is also held in place with one sheet metal screw Remove this screw and slide the top cover towards the back of the toaster When replacing the top cover be sure that it is properly positioned in the securing tracks 3 The bottom cover...

Страница 3: ...nal ends Refer to the wiring diagram E Fan Fan Housing Fan Motor Figure 2 1 Remove the bottom cover 2 Rotate Fan Blades which will expose 2 nuts securing the fan housing to the motor Remove these two nuts to remove the housing 3 To remove the fan motor but do NOT remove the 2 motor mounting bracket nuts slide the motor until clearance is achieved 4 Cut the wire harness ties to gain access to the w...

Страница 4: ...on I Conveyor Shaft Sprocket Figure 3 5 6 1 Remove right side panel Section A 2 Remove drive chain Section H 3 Loosen set screw on hub of sprocket and slide sprocket off shaft 4 When installing new sprocket make sure set screw rests in hole of shaft 5 Replace drive chain Section H J Conveyor Belt Figure 3 4 7 1 Remove right and left side panels Section A 2 Loosen but do NOT remove the bearing reta...

Страница 5: ... Element As sembly Figure 3 4 8 9 10 1 Remove right and left side panels Remove top cover and chimney Section A 2 Remove the 6 sheet metal screws 3 on each side securing the assembly to toaster sides 3 Disconnect the 2 wires at heating element terminal ends 4 Carefully lift out assembly 5 Reverse this procedure to install new assembly Refer to wiring diagram M Individual Heating Element Figure 3 4...

Страница 6: ...6 ...

Страница 7: ...7 ...

Страница 8: ...8 1111 N Hadley Rd Fort Wayne In 46804 Tel 800 701 2992 Fax 260 436 0735 www mercosavory com ...

Отзывы: