background image

P 3

Please retain product label and instructions for future reference

             

Window Cross A 500mm 

WC1627-500mm x8

Window Cross B 1094mm 

WC1904-500mm x4

50mm Screw x 65

40mm Screw x14

Felt Tacks x140

20mm Screw x12

30mm Screw x103

30mm Black Screw x48

20mm Black Screw x10

10mm Screw x6

Nail Bag

Pre Assembly

Remove the transportation blocks from 

the bottom and top of each panel

before beginning assembly

Step 2

 

Place the Plain Gable 

(No. 2)

 and Plain 

Panel 

(No. 7)

 onto the Floor. Secure the 

Panels together with 3x50mm screws as 

shown.

**Do not fix to the Floor until the Roof 

is fitted.

 

3x50mm screws. 

Pre drill 

hole

50mm 

screw

Step 3

 

Fix the Window panel 

(No. 8)

 into    

position with 3x50mm.

*Plain panels and Window panels are 

interchangable.

**Do not fix to the Floor until the Roof 

is fitted.

   

3x50mm screws. 

Pre drill 

hole

50mm 

screw

7

2

Step 1

 

Flip the Floor panels 

(No. 6) 

upside 

down  and secure together as shown 

with 5x40mm screws.

Place the Floor onto a flat, level base, 

ensuring the base has suitable 

drainage, free from areas where 

standing water can collect. 

5x50mm screws. 

 

Pre drill 

hole

50mm 

screw

8

6

6

Содержание Wessex 03WES1208-V3

Страница 1: ...ed but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow Our buildings are pr...

Страница 2: ...x2 2 1 3 4 5 6 7 8 Window AI 03FW540X1132 V1 x2 Rail AI 03WESRAIL V3 x2 Master Door AI 03MDFG1720X475 V1 Slave Door AI 03FG1720X475 V1 9 10 11 12 Fascia 1365mm S1295 1385mm angled x4 Window Cross A 50...

Страница 3: ...Panels together with 3x50mm screws as shown Do not fix to the Floor until the Roof is fitted 3x50mm screws Pre drill hole 50mm screw Step 3 Fix the Window panel No 8 into position with 3x50mm Plain p...

Страница 4: ...fix to the Floor until the Roof is fitted 6x50mm screws Pre drill hole 50mm screw Step 6 Place the Veranda No 4 at the front of the building Do not fix to the Floor until the Roof is fitted 7 8 4 1 2...

Страница 5: ...aps of the gable framing Make sure the Roof is flush to the rear of the building and secure with 6x50mm screws as shown Do not fix to the Floor until the Roof is fitted 10x30mm screws Pre drill hole 2...

Страница 6: ...the Floor with 4x50mm screws per panel 16x50mm screws Pre drill hole 50mm screw 15 15 15 15 5 3 14 Step 14 Fix the Gable Trims No 16 to the build ing with 2x30mm screws per Trim Fix the Cover Strips...

Страница 7: ...hown in the diagram Making sure there is 50mm of overhang Fix to the buildings using evenly spaced felt tacks 140xFelt tacks Felt tacks Step 15 Fix the Rails No 9 to the building as shown with 3x40mm...

Страница 8: ...first Door Gable windows come secured within the panel 24x30mm screws Pre drill hole 30mm screw Step 19 Fix 3 Hinges No 23 to each Door No 10 No 11 securing with 4x30mm black screws per hinge Position...

Страница 9: ...ews Pre drill hole 20mm screw Step 24 Fix the Turn Buttons No 24 to the top of each door with 1x20mm black screw per Button 2x20mm black screws Pre drill hole 30mm screw 22 22 24 21 Step 23 Fix the Pr...

Страница 10: ...point 12x20mm screws 6x10mm screws Pre drill hole 10mm screw 18 17 17 20mm screw Please retain product label and instructions for future reference P 10 AFTER TREATMENT score around protective cover o...

Отзывы: