background image

P 2

03WES1208-V3 

Overall Dimensions:

Width =2494mm 

Depth = 33616mm 

Height = 2298mm

Base Dimensions: 

Width = 2379mm 

Depth = 3616mm 

Please retain product label and instructions for future reference

             

Before assembly  

please make sure you have a 

suitable base ready to erect your 

building 

 

MADE IN GREAT BRITAIN

Door Gable

AI-03WESDG2354X2213-V3

Plain Gable

AI-03WESG2354X2213-V3

Plain Panel

AI-03WESPP1490X1698-V3 

x2

Window Panel

AI-03WESWP1490X1698-V3 

x2

Floor

 AI-01TAGF2350X1487-V3 

x2

Veranda

AI-03WESV2387X628-V3

 Roof

AI-03WESR2409X1345-V3 x2

2

1

3

4

5

6

7

8

Window

AI-03FW540X1132-V1

x2

Rail

AI-03WESRAIL-V3

x2

Master Door

AI-03MDFG1720X475-V1

Slave Door

AI-03FG1720X475-V1

9

10

11

12

Fascia 1365mm 

S1295-1385mm angled 

x4

Window Cross A 500mm 

WC1627-500mm x8

Window Cross B 1094mm 

WC1904-500mm x4

Veranda Upright 1699mm 

F2744-1720mm angled 

x2

Cover Trims 1694mm 

S1240-1694mm 

x6

13

15

16

17

14

18

19

20

Press Lock

PI-07-0018

2x Ring Pull

PI-07-0032

6x Hinges

PI-07-0004

2x Turn Button

PI-07-0032

23

21

22

24

25

PI-07-0011

8x Window Blocks

26

2x Shed Finial 

SHED DIAMOND FINIAL

Roof B

AI-03WESRB1223X1345-V3 

Roof Bearer 2924mm 

F2770-2924mm  

Roof Support 619mm 

F2770-659mm ANGLED 

x2

Gable Trims 624mm 

S1228-624mm 

x8

27

28

2x ‘L’ Bracket

PI-07-0012

2x U Channel

PI-07-0013

Содержание Wessex 03WES1208-V3

Страница 1: ...ed but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow Our buildings are pr...

Страница 2: ...x2 2 1 3 4 5 6 7 8 Window AI 03FW540X1132 V1 x2 Rail AI 03WESRAIL V3 x2 Master Door AI 03MDFG1720X475 V1 Slave Door AI 03FG1720X475 V1 9 10 11 12 Fascia 1365mm S1295 1385mm angled x4 Window Cross A 50...

Страница 3: ...Panels together with 3x50mm screws as shown Do not fix to the Floor until the Roof is fitted 3x50mm screws Pre drill hole 50mm screw Step 3 Fix the Window panel No 8 into position with 3x50mm Plain p...

Страница 4: ...fix to the Floor until the Roof is fitted 6x50mm screws Pre drill hole 50mm screw Step 6 Place the Veranda No 4 at the front of the building Do not fix to the Floor until the Roof is fitted 7 8 4 1 2...

Страница 5: ...aps of the gable framing Make sure the Roof is flush to the rear of the building and secure with 6x50mm screws as shown Do not fix to the Floor until the Roof is fitted 10x30mm screws Pre drill hole 2...

Страница 6: ...the Floor with 4x50mm screws per panel 16x50mm screws Pre drill hole 50mm screw 15 15 15 15 5 3 14 Step 14 Fix the Gable Trims No 16 to the build ing with 2x30mm screws per Trim Fix the Cover Strips...

Страница 7: ...hown in the diagram Making sure there is 50mm of overhang Fix to the buildings using evenly spaced felt tacks 140xFelt tacks Felt tacks Step 15 Fix the Rails No 9 to the building as shown with 3x40mm...

Страница 8: ...first Door Gable windows come secured within the panel 24x30mm screws Pre drill hole 30mm screw Step 19 Fix 3 Hinges No 23 to each Door No 10 No 11 securing with 4x30mm black screws per hinge Position...

Страница 9: ...ews Pre drill hole 20mm screw Step 24 Fix the Turn Buttons No 24 to the top of each door with 1x20mm black screw per Button 2x20mm black screws Pre drill hole 30mm screw 22 22 24 21 Step 23 Fix the Pr...

Страница 10: ...point 12x20mm screws 6x10mm screws Pre drill hole 10mm screw 18 17 17 20mm screw Please retain product label and instructions for future reference P 10 AFTER TREATMENT score around protective cover o...

Отзывы: