Please retain product label and instructions for future reference
Tulip Playhouse
Door Instructions
23
24
14
15
Step 13
Parts needed - &
Position the door centrally to the Door
(No. 20)
aperture ensuring any gap is
equal on both sides.
Once you are happy the door is in the
correct position place a Hinge
(No. 17)
at
the top and bottom of the door, ensuring
the screws will go into the framing (in
cases where you have been supplied three
hinges use the third in the middle of the
door) and using 30mm black screws fix
the hinge to the door and the door gable.
14x30mm Black screws
30mm
screw
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back
It is ESSENTIAL that you apply wood treat
-
ment immediately after the building has
been assembled.
20
17
Step 14
Parts needed - & & &
Place the Wooden Door Handle
(No. 14)
on the outside of door and use a 60mm screw
from the inside to secure. Pre drill hole first
to avoid splitting.
On the inside of the door opening fix the
Ply Door Stop
(No. 15)
to the bottom left
corner using 3x20mm screws.
Sandwich the Door Styrene
(No. 24)
between
the Door ‘s hole and Door Flower
(No. 23)
then fix using 3 x 10mm screws.
Ensure the glazing covers the cut out and
the screws do not crack hit the glazing.
15x20mm screws
3x10mm screws
23
15
14
24
1!
2!
Pre drill
hole
1!
2!
Pre drill
hole
20mm
screw
10mm
screw
3!
Playhouse Maintenance:
It is recommended that the following checks and maintenance are carried out at the begin-
ning of each season as well as at regular intervals during the usage season.
- Check all nuts /bolts/ screws for tightness and tighten when required.
- Check for movement / opening of wood giving rise to protrusion of nail heads and tips.
- Check hinges.
- Replace defective parts in accordance with the manufacturers instructions.
- Check any crossbeams, suspensions and anchors.
- If a swing is included; check the swing seat, chains and ropes.
IF THESE CHECKS ARE NOT CARRIED OUT THE ACTIVITY TOY COULD BECOME A HAZARD