Tulip Playhouse

 Door Instructions

23

24

14

15

Step 13

Parts needed -             &

 

Position the door centrally to the Door 

(No. 20) 

aperture ensuring any gap is 

equal on both sides.

Once you are happy the door is in the 

correct position place a Hinge 

(No. 17) 

at 

the top and bottom of the door, ensuring 

the screws will go into the framing (in 

cases where you have been supplied three 

hinges use the third in the middle of the 

door) and using 30mm black screws fix 

the hinge to the door and the door gable.

14x30mm Black screws

30mm 

screw

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

It is ESSENTIAL that you apply wood treat

-

ment immediately after the building has 

been assembled.

20

17

Step 14

Parts needed -            &             &            & 

Place the Wooden Door Handle 

(No. 14)

 

on the outside of door and use a 60mm screw 

from the inside to secure. Pre drill hole first

to avoid splitting.

On the inside of the door opening fix the 

Ply Door Stop 

(No. 15)

 to the bottom left 

corner using 3x20mm screws.

Sandwich the Door Styrene 

(No. 24)

 between 

the Door ‘s hole and Door Flower 

(No. 23)

 then fix using 3 x 10mm screws. 

Ensure the glazing covers the cut out and 

the screws do not crack hit the glazing.

15x20mm screws

3x10mm screws

 

 

23

15

14

24

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

20mm 

screw

10mm 

screw

3!

Playhouse Maintenance:

It is recommended that the following checks and maintenance are carried out at the begin-

ning of each season as well as at regular intervals during the usage season.

- Check all nuts /bolts/ screws for tightness and tighten when required.

- Check for movement / opening of wood giving rise to protrusion of nail heads and tips.

- Check hinges.

- Replace defective parts in accordance with the manufacturers instructions. 

- Check any crossbeams, suspensions and anchors.

- If a swing is included; check the swing seat, chains and ropes.

IF THESE CHECKS ARE NOT CARRIED OUT THE ACTIVITY TOY COULD BECOME A HAZARD

Содержание Tulip Playhouse 02TUL411411-V4-PEFC

Страница 1: ...asphalt or any hard surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base...

Страница 2: ...5mm Cover Trims 12x45x1155mm Fascia Board 12x95x980mm Roof Eave 28x28x1520mm FS2828 1500mm SR1295 1470mm FS2828 1155mm S1245 1155mm FAS980x95mm FS2828 1520mm QTY x2 QTY x2 QTY x4 QTY x3 QTY x5 18 15 F...

Страница 3: ...2X203mm BEADING 9X12X247mm QTY x4 QTY x4 22 Window AI 02PHOW V1 QTY x3 20 21 Poppy Playhouse Door and Window Pack Tulip Playhouse Door and Window Pack Door AI 02TUL411411 V3D 20 Window AI 02PHOW V1 QT...

Страница 4: ...8 along the joists and against the floor sheet Spread them evenly making sure the end board is flush with the framing Fix using 2 x 30mm screw for each board along the dotted lines shown on the illust...

Страница 5: ...the roof ensuring they come together at the top using 40mm screws directly through the roof sheet at the top Make sure to attach the roofs to the ridge bar 6x30mm screws 24x40mm screws 40mm screw 30m...

Страница 6: ...here is a 50mm overhang around the sides Fix using felt tacks at 100mm intervals 60x Felt Tacks Felt tacks Step 10 Parts needed At the back of the building fix the two Cover Trims No 10 to either end...

Страница 7: ...14x30mm screws 30mm screw Beading Beading 26 26 23 24 25 25 25 25 26 26 Step 15 Parts needed Place the Wooden Door Handle No 14 on the outside of door and use a 60mm screw from the inside to secure Pr...

Страница 8: ...om the inside to secure Pre drill hole first to avoid splitting On the inside of the door opening fix the Ply Door Stop No 15 to the bottom left corner using 3x20mm screws Sandwich the Door Styrene No...

Отзывы: