background image

P 3

Please retain product label and instructions for future reference

             

Door

Window Cross

QTY x3

PI-04-0013

AI-02POPDOOR594X1058-V2

23

Window Bar  A- 9x44x528mm

WC944-528mm

Window Bar B - 9x44x464mm

WC944-464mm

24

25

26

Beading- 9x12x203mm

Beading- 9x12x245mm

BEADING 9X12X203mm

BEADING 9X12X247mm

QTY x4

QTY x4

22

Window 

AI-02PHOW-V1

QTY x3

20

21

Poppy Playhouse

 Door and Window Pack

Tulip Playhouse

 Door and Window Pack

Door

AI-02TUL411411-V3D

20

Window 

AI-02PHOW-V1

QTY x3

21

23

24

Door Flower

Door Styrene

PI-04-0016

PI-05-0014

Pre Assembly

Before assembling remove the transportation

blocks from the bottom of each panel.

Window Cross

QTY x3

PI-04-0013

22

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

Содержание Tulip Playhouse 02TUL411411-V4-PEFC

Страница 1: ...asphalt or any hard surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base...

Страница 2: ...5mm Cover Trims 12x45x1155mm Fascia Board 12x95x980mm Roof Eave 28x28x1520mm FS2828 1500mm SR1295 1470mm FS2828 1155mm S1245 1155mm FAS980x95mm FS2828 1520mm QTY x2 QTY x2 QTY x4 QTY x3 QTY x5 18 15 F...

Страница 3: ...2X203mm BEADING 9X12X247mm QTY x4 QTY x4 22 Window AI 02PHOW V1 QTY x3 20 21 Poppy Playhouse Door and Window Pack Tulip Playhouse Door and Window Pack Door AI 02TUL411411 V3D 20 Window AI 02PHOW V1 QT...

Страница 4: ...8 along the joists and against the floor sheet Spread them evenly making sure the end board is flush with the framing Fix using 2 x 30mm screw for each board along the dotted lines shown on the illust...

Страница 5: ...the roof ensuring they come together at the top using 40mm screws directly through the roof sheet at the top Make sure to attach the roofs to the ridge bar 6x30mm screws 24x40mm screws 40mm screw 30m...

Страница 6: ...here is a 50mm overhang around the sides Fix using felt tacks at 100mm intervals 60x Felt Tacks Felt tacks Step 10 Parts needed At the back of the building fix the two Cover Trims No 10 to either end...

Страница 7: ...14x30mm screws 30mm screw Beading Beading 26 26 23 24 25 25 25 25 26 26 Step 15 Parts needed Place the Wooden Door Handle No 14 on the outside of door and use a 60mm screw from the inside to secure Pr...

Страница 8: ...om the inside to secure Pre drill hole first to avoid splitting On the inside of the door opening fix the Ply Door Stop No 15 to the bottom left corner using 3x20mm screws Sandwich the Door Styrene No...

Отзывы: