background image

Please retain product label and instructions for future reference

             

Please retain product label and instructions for future reference

             

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

www.merciagardenproducts.co.uk      P5

2

4

Step 4

Parts needed -            &

 

Fix the corners of the Plain Gable 

(

No. 2

) and the Plain Panel (

No. 4

with 3x50mm screws as shown in 

diagram.

3x50mm screws

50mm 

screw

2

4

Step 5

Parts needed -           & 

Fix the Door Gable (

No. 1

) and 

Window Panel (

No. 3

) using 

the same method shown 

previously in step 5.

Position the panels so that 

they sit central on the floor.

9x50mm screws

50mm 

screw

1

3

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

Step 7

Parts needed - 

Fix the Bunk Floor Block A 

(No. 22) 

to 

the door gable using 2x40mm screws 

through the framing into each end of 

the block as shown in the diagram.

2x40mm screws

Step 6

Parts needed -           &

 

Fix the Bunk Floor Support Bar 

(

No. 12

) to the Door Gable (

No. 1

)  

with 4x60mm screws at a height of 

1055mm from the bottom piece of 

framing to the top of the bar as 

shown in the diagram. 

4x60mm screws. 

60mm 

screw

1

12

1!

2!

Pre drill 

hole

12

1055mm

3

1

22

22

1

40mm 

screw

Содержание Snowdrop

Страница 1: ...hard surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be sligh...

Страница 2: ...all Roof Sheet 1795x990mm 8 AI 02SNO0705 V4F AI 02SNO0705 V4BF PI 03 0030 PI 03 0031 Rail Guard 9 10 Door 11 Window QTY x3 AI 02PHOW V1 AI 02SNO0705 V4CR AI 02SNO0705 V4D Support Block 495mm 13 14 15...

Страница 3: ...50mm Screw x 53 60mm Screw x 22 20mm Screw x 16 40mm Screw x 40 Felt Tacks x 80 10mm Screw x 5 30mm Black Screw x 21 Nail Bag 25 Finial 26 27 28 Door Stop Window Frame Butterfly Window Shutters Window...

Страница 4: ...x3 Lay the Door Gable No 1 with the boards facing up on a flat surface Place the door within the door aperture and position the Door No 10 so that you have a 12mm gap from the door to the door gable o...

Страница 5: ...n previously in step 5 Position the panels so that they sit central on the floor 9x50mm screws 50mm screw 1 3 1 2 Pre drill hole 1 2 Pre drill hole 1 2 Pre drill hole Step 7 Parts needed Fix the Bunk...

Страница 6: ...mm screw through the framing into each block as shown in the diagram Then fix the Bunk Floor Block C No 23 onto the framing as shown in the diagram Fix using 2x40mm screws down into block D 4x40mm scr...

Страница 7: ...IOR TO ASSEMBLY 1 2 Pre drill hole 50kg Step 12 Parts needed Place the Bunk Floor No 6 onto the framing Fix from underneath going through the framing up into the bunk floor using 4x60mm screws each si...

Страница 8: ...of is fitted and the building is square secure the building to the Floor fixing the panels onto the floor using 18x50mm screws in alignment with the floor joists 18x50mm Screws 50mm screw Step 17 Part...

Страница 9: ...ews Fix the Window Shutters x2 No 30 through the Door Gable into the shutter using 4x30mm screws per shutter Repeat with both windows 12x40mm screws 60mm screw 29 30 A B A B 1 2 Pre drill hole 1 2 Pre...

Страница 10: ...d that the following checks and maintenance are carried out at the begin ning of each season as well as at regular intervals during the usage season Check all nuts bolts screws for tightness and tight...

Отзывы: