background image

02SNO0705-V4-PEFC

Overall Dimensions:

Width = 2310mm 

Depth = 1819mm 

Height = 2020mm

Base Dimensions: 

Width = 2082mm 

Depth = 1448 mm 

Please retain product label and instructions for future reference

           

Before assembly  

please make sure you have a 

suitable base ready to erect your 

building 

 

MADE IN GREAT BRITAIN

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

www.merciagardenproducts.co.uk      P2

1

2

3

Window Side

Door Gable

Plain Gable

Plain Panel

4

AI-02SNO0705-V4DG

AI-02SNO0705-V4PG

AI-02SNO0705-V4WS

AI-02SNO0705-V4PS

Floor

Bunk Floor

Large Roof Sheet 

1795 x 1400mm

5

6

7

Small Roof Sheet

1795x990mm

8

AI-02SNO0705-V4F

AI-02SNO0705-V4BF

PI-03-0030

PI-03-0031

Rail Guard

9

10

Door

11

Window

QTY x3

AI-02PHOW-V1

AI-02SNO0705-V4CR

AI-02SNO0705-V4D

Support Block - 495mm 

13

14

15

19

12

16

18

20

17

Roof Eave - 1795mm

Roof Support Bar - 1448mm 

Fascia - 1427mm 

Ladder Right 

Bunk Floor Support Bar - 1270mm 

Fascia - 1041mm 

Ladder Step - 390mm

Fascia Block -140mm 

F2744-1270mm

FS2828-1795mm

F2744-1448mm

FAS1295-1427mm

FAS1295-1041mm

F4444-140mm

F2744-535mm

PRO2795-1365mm-RIGHT

Ladder Left

PRO2795-1365mm-LEFT

PRO2795-390mm

QTY x2

QTY x2

QTY x2

QTY x3

QTY x3

1!

Look for the symbols and follow the safety guidlines below.

Ensure screw heads 

are subflush and 

sand down any 

splinters created.

Ensure the screws are 

fixed squarely and do 

not protrude.

12mm gap  

surrounding the 

door.

2!

3!

50kg

 

Содержание Snowdrop

Страница 1: ...hard surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be sligh...

Страница 2: ...all Roof Sheet 1795x990mm 8 AI 02SNO0705 V4F AI 02SNO0705 V4BF PI 03 0030 PI 03 0031 Rail Guard 9 10 Door 11 Window QTY x3 AI 02PHOW V1 AI 02SNO0705 V4CR AI 02SNO0705 V4D Support Block 495mm 13 14 15...

Страница 3: ...50mm Screw x 53 60mm Screw x 22 20mm Screw x 16 40mm Screw x 40 Felt Tacks x 80 10mm Screw x 5 30mm Black Screw x 21 Nail Bag 25 Finial 26 27 28 Door Stop Window Frame Butterfly Window Shutters Window...

Страница 4: ...x3 Lay the Door Gable No 1 with the boards facing up on a flat surface Place the door within the door aperture and position the Door No 10 so that you have a 12mm gap from the door to the door gable o...

Страница 5: ...n previously in step 5 Position the panels so that they sit central on the floor 9x50mm screws 50mm screw 1 3 1 2 Pre drill hole 1 2 Pre drill hole 1 2 Pre drill hole Step 7 Parts needed Fix the Bunk...

Страница 6: ...mm screw through the framing into each block as shown in the diagram Then fix the Bunk Floor Block C No 23 onto the framing as shown in the diagram Fix using 2x40mm screws down into block D 4x40mm scr...

Страница 7: ...IOR TO ASSEMBLY 1 2 Pre drill hole 50kg Step 12 Parts needed Place the Bunk Floor No 6 onto the framing Fix from underneath going through the framing up into the bunk floor using 4x60mm screws each si...

Страница 8: ...of is fitted and the building is square secure the building to the Floor fixing the panels onto the floor using 18x50mm screws in alignment with the floor joists 18x50mm Screws 50mm screw Step 17 Part...

Страница 9: ...ews Fix the Window Shutters x2 No 30 through the Door Gable into the shutter using 4x30mm screws per shutter Repeat with both windows 12x40mm screws 60mm screw 29 30 A B A B 1 2 Pre drill hole 1 2 Pre...

Страница 10: ...d that the following checks and maintenance are carried out at the begin ning of each season as well as at regular intervals during the usage season Check all nuts bolts screws for tightness and tight...

Отзывы: