background image

20mm 

screw

P 5

Please retain product label and instructions for future reference

             

Step 8

Fit the Fascia  Block (

No. 12

) to the front 

of the building using 4x30mm screws, make 

sure it is flush with the outside edge of each 

roof sheet.

4x30mm screws. 

Step 9

Cut Felt (

No. 18

) into 3 sheets and lay onto 

roof as shown in diagram ensuring there is a 

50mm overhang around the sides. 

Fix using felt tacks at 100mm intervals.

60x Felt tacks

Felt 

tacks 

Step 10

Fix Fascias (

No. 11

) and Finials (

No. 14

) using 

40mm screws. Pre drill holes to avoid splitting. 

Ensure to the trap the felt between the 

fascia and building.

12x40mm screws. 

11

14

Step 11

Place a Window Cross(

No. 15

) against the

 inside of each window. Position the frame 

centrally to the window and fix using 

4x20mm screws per frame.

8x20mm screws. 

Pre drill 

hole

40mm 

screw

Pre drill 

hole

30mm 

screw

Pre drill 

hole

12

15

Отзывы: