P 3
Please retain product label and instructions for future reference
Place the
floor
on a firm and
level base, ensure base has
suitable drainage free from
areas where standing water
can collect. (See front page on
base requirements).
Step 2
1
3 x 50mm screws
DO NOT SECURE THE PRODUCT TO
THE FLOOR UNTIL AFTER THE
ROOF HAS BEEN FITTED.
Position the panels so there are
equal gaps between the floor
and cladding
Step 3
Fix the corners with
3 x 50mm screws as in the
diagram.
4
2
Attach the right gable and a back panel
together with 3x50mm screws.
3 x 50mm screws
DO NOT SECURE THE BUILDING TO
THE FLOOR UNTIL AFTER THE
ROOF HAS BEEN FITTED.
Fix the corners with
3 x 50mm screws as in the
diagram.
Position the panels so there are
equal gaps between the floor
and cladding
Step 4
Attach the left gable to the back panel
with 50mm screws.
3
6 x 50mm screws
Step 5
Attach the roof ontop of the gables and
fix through the framing on the side into
the gable cladding using 50mm screws.
5