9
13
10
Eaves Fixing
11
1
2
3
14
1. Fix Roof bar support with 2x L bracket, using 8x30mm screws
2. Fix roof support strip as shown in
illustration with 3x L bracket using
12x 30mm screws.
Position roof sheets as shown in
illustration. Fix using 25x30mm screws and
10x40mm screws to secure roof through
uprights.
Position styrene into
each window and
hold with window
cross. Secure using
30mm screw in each
4x glazing bead.
*Remove protective
film on both sides of
styrene before fixing.
Roof Support Bar
Roof Sheets
Fascia Strips
Glazing
12
Fix Fascia strips to roof sheet using
3x30mm screws per strip and screw
togther with 4x40mm screws.
Fix the eaves to two of the OSB roof
sheets using 6 x 30mm screws.
Roll felt from front to back leaving a 50mm
felt overlap to the front, back and sides. Secure
with felt tacks at 100mm intervals as soon
in the diagram
Use capping felt along the Apex of the
building (4)
Felting Roof
110 x felt tacks
1
2
100mm
spacing
for felt
tacks
50mm
Overhang
Fold
Corners
1
2
3
4
3 4
Fix handle to
main door uising
4x25mm screws.
Door Handle
Fix door latch and
hook to cover
small doors with
4x25mm screws.
WINDOW
30mm
screws
1.
Fix window shutters with 4x
30mm screw, fix through building
cladding into the window shutters
2.
Fix window box with 4x 30mm
screws, fix through building
cladding into the window box, as
in diagram
* Bramble Only
*Chestnut
Only