Mercia Garden Products 0634LOG249-V4 Скачать руководство пользователя страница 8

P 8

Please retain product label and instructions for future reference

             

Step 10 

(See Pre-Assembly)

Parts needed - No. 11 QTY 2

Place the last two boards

(No. 11) onto the building.

Secure into position at

either end by screwing 

through the notch into the

board below. 

*Ensure that the boards are

level and flush with each

other as you lay each one.

**Ensure to stagger the 

screws so as not to collide 

with the previous screw.

4x70mm Screws 

Pre drill 

hole

70mm 

screw

11

11

IMPORTANT:  Pre-drill before fixing screws.

IMPORTANT:  Pre-drill before fixing screws.

Pre drill 

hole

Step 11

Parts needed - No. 18 QTY 3

 

Align the Roof Purlin(

s

) (No. 

18) into the cut out slots on each 

gable top ensuring each roof purlin 

interlocks the boards.

 

Secure the roof purlins at 

each end by screwing through the 

purlins into the boards (ensure to 

pre-drill to avoid the boards 

splitting) using 4x70mm screws per 

roof purlin.

*Please note:

 The gable shown is for 

illustrative purposes and may differ 

in width from your choice in 

product. 

Nevertheless, despite any 

differences 

the process of fixing the roof purlins 

is the same.

70mm 

screw

18

18

18

18

a

b

a

b

Содержание 0634LOG249-V4

Страница 1: ...r during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during...

Страница 2: ...893mm QTY 12 LB34 C 893 Log Board 34x120x1625mm QTY 24 LB34 B 1625 Log Board 34x120x5000mm QTY 19 LB34 A 5000 Log Board 34x45x5000mm QTY 2 LB34RG45 A 5000 Roof Board 16x121x2114mm QTY 90 MB16 C 2114 F...

Страница 3: ...ered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves P 3 Please retain product label and instructions for future reference Felt Tacks x600 70...

Страница 4: ...wing the same method arrange the remaining framing No 17 inside the assembled frame Ensure there is an equal amount of space between each frame Secure each of the frames in place using 2x70mm screws f...

Страница 5: ...t level Ensure that the boards are level and flush with each other as you lay each one IMPORTANT Pre drill before fixing screws Step 4 Once you have laid 6 log boards off of the starter up the door se...

Страница 6: ...e by 12 13 boards refer to door installation instructions if not you can install the door at step 7 Please Note The short boards placed to create the opening s for the doors windows can be placed eith...

Страница 7: ...he door frame IMPORTANT Pre drill before fixing screws 3 3 Step 8 See Pre Assembly Parts needed No 5 QTY 1 No 10 QTY 1 No 12 QTY 1 No 13 QTY 1 Following the same method outlined in Pre Assembly lay th...

Страница 8: ...11 IMPORTANT Pre drill before fixing screws IMPORTANT Pre drill before fixing screws Pre drill hole Step 11 Parts needed No 18 QTY 3 Align the Roof Purlin s No 18 into the cut out slots on each gable...

Страница 9: ...he apex The last board on each side will overhang Using a staight edge and a pencil mark out a line as a guide Cut along the pencil mark and remove the excess Place the cut down boards back onto the r...

Страница 10: ...ough each of the floor boards into the floor bearers 344x40mm Screws 40mm screw Pre drill hole Cut to fit Roof Closure Trim Internal 23 Measure and cut the closure trims to fit the internal space 23 2...

Страница 11: ...per fascia making sure to screw through the fascia into the roof purlins and eaves frame Ensure the angled cuts meet at the top of the apex 24x40mm Screws Pre drill hole 40mm screw Pre drill hole 80mm...

Страница 12: ...It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled P 12 Please retain product label and instructions for future reference...

Отзывы: