background image

P 16

Please retain product label and instructions for future reference

 

IMPORTANT: 

Pre-drill before fixing screws.

45

42

Step 25

Parts needed - No. 42 QTY 1

    

 

   No. 43 QTY 1

 

 

   No. 44 QTY 1 

 

 

   No. 45 QTY 6

Place the finisher boards 

(

No. 42, 43, 44 & 45

) around the 

building, locating each board 

flush to the truss’.

Ensure there is at least a 42mm 

gap between parts 

No. 45 & 45

 

on both sides of the log cabin. 

Some adjustment may be 

required to ensure the roof 

structure rests correctly. 

Secure each board by screwing 

into the Roof Truss, using 

2x70mm screws per board, 

ensuring to stagger the screws to 

avoid  colliding.

14x70mm Screws 

Pre drill 

hole

70mm 

screw

45

45

43

45

44

45

45

42

44

45

45

45

45

45

Roof Assembly 1

Roof Assembly 2

45

45

45

45

42mm

42mm

Rubber Mallet 

may be required 

to fit parts.

45

43

Step 26

Parts needed - No. 48 QTY 2

    

 

  

 

Locate the last two ‘Roof Truss 

A’ 

(No. 48)

 into the 42mm gaps 

between the finisher boards 

No.45 & 45

 as shown in the

illustration. 

Some adjustment may be 

required to ensure the roof 

structure rests correctly. 

Fix in place by screwing into 

the purlin at an angle as shown 

in the illustration using 

1x90mm screws per Roof Truss. 

Secure the boards 

(No.45)

 in 

place by screwing through the 

purlin using 1x70mm screw 

per board, ensuring to stagger 

the screws to avoid colliding. 

4x70mm Screws 

2x90mm Screws 

70mm 

screw

Pre drill 

hole

48

48

45

45

45

45

Please note: You can adjust the 

blocks attached to the roof 

truss’ if necessary

.

48

48

45

45

Roof Assembly 1

Roof Assembly 2

IMPORTANT: 

Pre-drill before fixing screws.

90mm 

screw

45

45

Rubber Mallet 

may be required 

to fit parts.

Содержание 0634CSNE0303HGDD2SW-V1

Страница 1: ...where the building and base are going to be constructed Ensure that there will be access 60cm to all sides for maintenance work and annual treatment Ensure the base is level and is built on firm groun...

Страница 2: ...Y 1 Morticed for lock AI 06LOGDGMD750X1900 V3 13 14 15 17 17a 17c 18 19 20 21 Secondary DoorQTY 1 AI 06LOGDGSD750X1900 V3 Door Frame Left Upright 71x70x2065mm QTY 1 AI 0634LOGDUFL V3 Door Frame Right...

Страница 3: ...3000 Finisher Board 34x80x1945mm QTY 1 LB34RG80 J 1945 2x61 deg cut 1945mm finished Finisher Board 34x80x676mm QTY 1 LB34RG80 CGR 676 2x45 deg cut left 677mm finished Finisher Board 34x80x676mm QTY 1...

Страница 4: ...63 Fascia 16x120x2225mm QTY 1 S16120 2225 Roof Board Pack B QTY 2 AI 06LOGC3X3RBP2 V2 Roof Board Pack C QTY 2 AI 06LOGC3X3RBP3 V2 73 64 Fascia 16x120x2000mm QTY 2 S16120 2000 65 66 Fascia 16x120x1658...

Страница 5: ...x 12 70mm Screw x 39 80mm Bolt Set x 16 There may be extra screws present in the nail bag 80mm Screw x 24 Pre assembly Please note Each board interlocks at either end in a staggered pattern Before sec...

Страница 6: ...r using 10x90mm screws ensuring the frame is flush Once fully assembled ensure the bearers are square by measuring from corner to corner as illustrate making sure they are an equal measurement If the...

Страница 7: ...wn in the illustration 5x70mm Screws 70mm screw IMPORTANT Pre drill before fixing screws a b 40 36 22 41 32 1st 2nd 3rd 5th 4th 36 22 Step 4 Parts needed No 25 QTY 1 Make the log cabin level by adding...

Страница 8: ...lace the master and secondary doors No s 9 10 onto a flat surface and fix the Adjustable door hinge No 17c to the doors using 3x30mm screws per hinge Fix 3 x Adjustable Door Hinges No 17a b into posit...

Страница 9: ...slide the assembled door frame over the boards resting the frame on top of the starter board if you have not yet assembled the door frame refer to step 6 Please note This image is for illustrative pu...

Страница 10: ...be positioned on the inside of the building Pre drill hole 30mm screw Step 12 Parts Needed No 1 QTY 2 No 7 QTY 4 Position the window No 1 so that it sits centrally within the window frame Fix the fema...

Страница 11: ...thod as shown in the illustration bringing the board level to the top of the window and door frames Please note when you get to the top of the boards the right hand boards will be slightly lower Ensur...

Страница 12: ...ush with each other as you lay each one Rubber Mallet may be required to fit parts Step 18 Parts needed No 38 QTY 1 No 39 QTY 1 Lay the Finisher Boards No 38 39 onto the front of the log cabin to brin...

Страница 13: ...n Fix into position by screwing through the notches as shown in the illustration Ensure that the boards are level and flush with each other as you lay each one 2x120mm Screws Pre drill hole 120mm scre...

Страница 14: ...crewing through the truss into the Purlin at an angle as shown in the illustration using 1x90mm screw per truss 3x90mm Screws Pre drill hole 90mm screw Rubber Mallet may be required to fit parts Pre d...

Страница 15: ...fore fixing screws 48 48 48 Rubber Mallet may be required to fit parts Please note You can adjust the blocks attached to the roof truss if necessary IMPORTANT Pre drill before fixing screws Step 24 Pa...

Страница 16: ...y 1 Roof Assembly 2 45 45 45 45 42mm 42mm Rubber Mallet may be required to fit parts 45 43 Step 26 Parts needed No 48 QTY 2 Locate the last two Roof Truss A No 48 into the 42mm gaps between the finish...

Страница 17: ...ew Roof Assembly 1 Roof Assembly 2 IMPORTANT Pre drill before fixing screws 70mm screw 52 IMPORTANT Pre drill before fixing screws Step 28 Parts needed No 71 QTY 1 Pack A No 72 QTY 2 Pack B No 73 QTY...

Страница 18: ...e 5 sides 84x40mm Screws Pre drill hole 40mm screw A B C B C 72 73 73 71 72 A B C B C 72 73 73 71 72 Roof Assembly 1 Roof Assembly 2 IMPORTANT Pre drill before fixing screws Step 30 Parts needed No 71...

Страница 19: ...ch of the 5 sides 84x40mm Screws A B C B C 72 73 73 71 72 A B C B C 72 73 73 71 72 IMPORTANT Pre drill before fixing screws Roof Assembly 1 Roof Assembly 2 Pre drill hole Pre drill hole 40mm screw Ste...

Страница 20: ...m screw Step 34 Parts Needed No 8 QTY 2 Fix the casement stay No 8 onto the window No 1 and the casement stay pins to the window framing using 6x30mm screws Ensure the casement stay is centralised on...

Страница 21: ...nmongery Neverthe less the process of fixing the frames is the same Once components have been fitted try closing doors to ensure the doors can be closed and the lock works If your doors do need adjust...

Страница 22: ...4 5 6 7 8 Felt sheet dimensions 1 1600mm L x 1000mm W 2 2303mm L x 1000mm W 3 1655mm L x 1000mm W 4 3141mm L x 1000mm W 5 1600mm L x 1000mm W 6 820mm L x 1000mm W 7 680mm L x 1000mm W 8 2180mm L x 10...

Страница 23: ...bearers 200x40mm Screws 40mm screw Pre drill hole This is for illustrative purposes only and may differ from your floor 70 70 IMPORTANT Pre drill before fixing screws Roof Closure Trim Internal 67 Me...

Страница 24: ...cut to size in the same way as previously stated 34x40mm Screws Pre drill hole 40mm screw 63 64 64 65 65 65 62 Pre drill hole 80mm bolt 66 66 Step 44 Parts needed No 66 QTY 8 Arrange the storm braces...

Страница 25: ...indow frame fixing in place onto the framing above each window using 3x70mm screws per guard Attach the Rain Guard No 16 to the door frame fixing in place onto the framing above the Door using 3x70mm...

Отзывы: