
P 10
Please retain product label and instructions for future reference
Step 19
Parts needed - No. 27 QTY 2
Place the gable tops
(No. 27)
onto
the log cabin. Fix into position by
screwing through the notches
as shown in the illustration.
*Ensure that the boards are
level and flush with each
other as you lay each one.
4x70mm Screws
Pre drill
hole
70mm
screw
IMPORTANT:
Pre-drill before fixing screws.
27
27
Rubber Mallet
may be required
to fit parts.
Pre drill
hole
Step 20
Parts needed - No. 40 QTY 5
Align the Purlin(
s
) (
No. 40
)
into the cut out slots on each gable
top ensuring each purlin
interlocks the boards.
Secure the Purlins at each
end by screwing through the bars
into the boards (
ensure to pre-drill
to avoid the boards splitting
)
using 4x70mm screws per purlin.
*Please note:
The gable shown is for
illustrative purposes and may differ
in width from your choice in product.
Nevertheless, despite any differences
the process of fixing the purlins
is the same.
20x70mm Screws
70mm
screw
IMPORTANT:
Pre-drill before fixing screws.
a
b
a
40
b
40
40
40
40
40
40
Rubber Mallet
may be required
to fit parts.