background image

P8

Please retain product label and instructions for future reference

             

Step 6

Parts Needed -  No. 11 QTY 1

 

 

    No. 12 QTY 1

 

 

    No. 13 QTY 1

 

 

    No. 14 QTY 1

Arrange the left, right, top & bottom door 

frames 

(No’s. 11, 12, 13 & 14) 

onto a level 

surface. Secure the top and bottom frames to 

the uprights using 2x80mm screw per corner, 

ensuring the screws do 

NOT

 protrude through 

the front of the door framing.

8x80mm Screws

Pre drill 

hole

80mm 

screw

13

14

11

12

IMPORTANT : 

Pre-drill before fixing screws.

The internal lip of the door 

frame should be postioned on 

the inside of the building.

14

12

Step 7

Parts Needed - No. 9 QTY 1

 

 

   No. 10 QTY 1

 

 

   No. 17 QTY 6

             

The Adjustable Door Hinge 

(No.17)

 

comes in three parts. 

Fasten No. 17a into 17b as shown in the 

illustration.

         

Place the master and slave doors 

(No’s 9 & 10)

 onto a flat surface and fix the 

Adjustable door hinge 

(No.17c) 

to the doors 

using 3x30mm screws per hinge.  

Fix 3 x  Adjustable Door Hinges 

(No. 17a & 

b)

 into position onto the door frame using 

4x30mm screws per hinge.

*Ensure the hinges are fitted to the exter-

nal  of the door frame so the doors open 

outwards from the log cabin.

Locate the  doors into the hinges ensuring 

there is equal spacing on each side between 

the doors and door frame, and that the 

doors open & close freely without restric-

tion. 

It is important to fit the doors within the 

frames at this stage so that you can establish 

the position of the hinges. The hinges come 

in three parts. Remove the doors from the 

frame after fitting.

**Ensure to screw into the framing and not 

into the channel.

 

42x30mm  Screws

17a

Pre drill 

hole

30mm 

screw

9

10

17

  a

  b

17b

  a

  b

IMPORTANT : 

Pre-drill before fixing screws.

Slave Door

Master Door

Содержание 0628CSNE0303HGDD2SW-V1

Страница 1: ...where the building and base are going to be constructed Ensure that there will be access 60cm to all sides for maintenance work and annual treatment Ensure the base is level and is built on firm groun...

Страница 2: ...QTY 1 Morticed for lock AI 06LOGDGMD750X1900 V3 13 14 15 17 17a 17c 18 19 20 21 Slave DoorQTY 1 AI 06LOGDGSD750X1900 V3 Door Frame Left Upright 71x70x2065mm QTY 1 AI 0628LOGDUFL V3 Door Frame Right Up...

Страница 3: ...3000 Finisher Board 28x80x1945mm QTY 1 LB28RG80 J 1945 2x61 deg cut 1945mm finished Finisher Board 28x80x677mm QTY 1 LB28RG80 CGR 677 2x45 deg cut left 677mm finished Finisher Board 28x80x677mm QTY 1...

Страница 4: ...63 Fascia 16x120x2225mm QTY 1 S16120 2225 Roof Board Pack B QTY 2 AI 06LOGC3X3RBP2 V2 Roof Board Pack C QTY 2 AI 06LOGC3X3RBP3 V2 73 64 Fascia 16x120x2000mm QTY 2 S16120 2000 65 66 Fascia 16x120x1658...

Страница 5: ...x 12 70mm Screw x 85 70mm Bolt Set x 16 There may be extra screws present in the nail bag 80mm Screw x 24 Pre assembly Please note Each board interlocks at either end in a staggered pattern Before sec...

Страница 6: ...ly assembled ensure the bearers are square by measuring from corner to corner as illustrate making sure they are an equal measurement If the bearers are not alligned equally unscrew and adjust and re...

Страница 7: ...wn in the illustration 5x70mm Screws 70mm screw IMPORTANT Pre drill before fixing screws a b 40 36 22 41 32 1st 2nd 3rd 5th 4th 36 22 Step 4 Parts needed No 25 QTY 1 Make the log cabin level by adding...

Страница 8: ...on Place the master and slave doors No s 9 10 onto a flat surface and fix the Adjustable door hinge No 17c to the doors using 3x30mm screws per hinge Fix 3 x Adjustable Door Hinges No 17a b into posit...

Страница 9: ...slide the assembled door frame over the boards resting the frame on top of the starter board if you have not yet assembled the door frame refer to step 6 Please note This image is for illustrative pu...

Страница 10: ...be postioned on the inside of the building Pre drill hole 30mm screw Step 12 Parts Needed No 1 QTY 2 No 7 QTY 4 Position the window No 1 so that it sits centrally within the window frame Fix the femal...

Страница 11: ...thod as shown in the illustration bringing the board level to the top of the window and door frames Please note when you get to the top of the boards the right hand boards will be slightly lower Ensur...

Страница 12: ...ush with each other as you lay each one Rubber Mallet may be required to fit parts Step 18 Parts needed No 38 QTY 1 No 39 QTY 1 Lay the Finisher Boards No 38 39 onto the front of the log cabin to brin...

Страница 13: ...n Fix into position by screwing through the notches as shown in the illustration Ensure that the boards are level and flush with each other as you lay each one 2x120mm Screws Pre drill hole 120mm scre...

Страница 14: ...crewing through the truss into the Purlin at an angle as shown in the illustration using 1x90mm screw per truss 3x90mm Screws Pre drill hole 90mm screw Rubber Mallet may be required to fit parts Pre d...

Страница 15: ...fore fixing screws 48 48 48 Rubber Mallet may be required to fit parts Please note You can adjust the blocks attached to the roof truss if necessary IMPORTANT Pre drill before fixing screws Step 24 Pa...

Страница 16: ...y 1 Roof Assembly 2 45 45 45 45 42mm 42mm Rubber Mallet may be required to fit parts 45 43 Step 26 Parts needed No 48 QTY 2 Locate the last two Roof Truss A No 48 into the 42mm gaps between the finish...

Страница 17: ...ew Roof Assembly 1 Roof Assembly 2 IMPORTANT Pre drill before fixing screws 70mm screw 52 IMPORTANT Pre drill before fixing screws Step 28 Parts needed No 71 QTY 1 Pack A No 72 QTY 2 Pack B No 73 QTY...

Страница 18: ...e 5 sides 84x40mm Screws Pre drill hole 40mm screw A B C B C 72 73 73 71 72 A B C B C 72 73 73 71 72 Roof Assembly 1 Roof Assembly 2 IMPORTANT Pre drill before fixing screws Step 30 Parts needed No 71...

Страница 19: ...h screwed down in total on each of the 5 sides 84x40mm Screws A B C B C 72 73 73 71 72 A B C B C 72 73 73 71 72 IMPORTANT Pre drill before fixing screws Roof Assembly 1 Roof Assembly 2 Pre drill hole...

Страница 20: ...m screw Step 34 Parts Needed No 8 QTY 2 Fix the casement stay No 8 onto the window No 1 and the casement stay pins to the window framing using 6x30mm screws Ensure the casement stay is centralised on...

Страница 21: ...onmongery Neverthe less the process of fixing the frames is the same Once components have been fitted try closing doors to ensure the doors can be closed and the lock works If your doors do need adjus...

Страница 22: ...2 4 5 6 7 8 Felt sheet dimensions 1 1600mm L x 1000mm W 2 2303mm L x 1000mm W 3 1655mm L x 1000mm W 4 3141mm L x 1000mm W 5 1600mm L x 1000mm W 6 820mm L x 1000mm W 7 680mm L x 1000mm W 8 2180mm L x 1...

Страница 23: ...bearers 200x40mm Screws 40mm screw Pre drill hole This is for illustrative purposes only and may differ from your floor 70 70 IMPORTANT Pre drill before fixing screws Roof Closure Trim Internal 67 Me...

Страница 24: ...cut to size in the same way as previously stated 34x40mm Screws Pre drill hole 40mm screw 63 64 64 65 65 65 62 Pre drill hole 70mm bolt 66 66 Step 44 Parts needed No 66 QTY 8 Arrange the storm braces...

Страница 25: ...indow frame fixing in place onto the framing above each window using 3x70mm screws per guard Attach the Rain Guard No 16 to the door frame fixing in place onto the framing above the Door using 3x70mm...

Отзывы: