background image

1

Pre drill 

hole

80mm 

screw

IMPORTANT : 

Pre-drill before  xing screws.

Step  6
Parts Needed - No. 1 QTY 3

No.  1

*Place  the  frame  &  window  at  onto  a  level 
surface to help  x into place.

48x80mm Screws

IMPORTANT : 

Pre-drill before  xing screws.

8

11

9

10

Step 7
Parts Needed - No. 8 QTY 1
 

 

    No. 9 QTY 1

 

 

    No. 10 QTY 1

 

 

    No. 11 QTY 1

No’s.  8,  9,  10,  &  11

NOT

8x80mm Screws

Pre drill 

hole

80mm 

screw

11

9

Содержание 0619RANE0325FGSD3TW-V1

Страница 1: ...nd in the case of childrens products independently tested to EN71 level we cannot accept responsibility for your safety whilst erecting or using this product Refer to the instructions pages for your s...

Страница 2: ...19LOGTWTF V3 Window Frame Bottom 71x70x688mm QTY 3 AI 0619LOGTWBF V3 Window Contents 12 7 8 9 Fully Glazed Door QTY 1 AI 06LOGSANFGMD750X1900 V1 10 11 Door Frame Left Upright 71x70x2065mm QTY 1 AI 061...

Страница 3: ...20 3024 Bearer 44x44x2308mm QTY 2 F4444 2308 PT Bearer 44x44x2716mm QTY 8 F4444 2716 PT Roof Board 12x121x1344mm QTY 56 MB12 1344 Floor Board 12x121x2264mm QTY 26 MB12 2264 NotchedWindow Gable 2500mm...

Страница 4: ...re xing screws 31 31 31 31 31 31 31 30 31 Pre drill hole 70mm screw Step 2 Parts Needed No 31 QTY 6 No 31 Ensure there is an equal amount of space between each frame 24x70mm Screws IMPORTANT Pre drill...

Страница 5: ...and ush with each other as you lay each one Please Note The short boards at the front side of the building either side of the door and window opening s can be placed either side depending on your need...

Страница 6: ...eded No 1 QTY 3 No 1 Place the frame window at onto a level surface to help x into place 48x80mm Screws IMPORTANT Pre drill before xing screws 8 11 9 10 Step 7 Parts Needed No 8 QTY 1 No 9 QTY 1 No 10...

Страница 7: ...s 5 6 No 21 Ensure that the boards are level and ush with each other as you lay each one a b a b 21 20 Step 9 Parts Needed No 21 QTY 18 No 21 If you have not yet assembled your door frames please refe...

Страница 8: ...oards are level and ush with each other as you lay each one a b a b 21 20 25 Step 11 No 25 If you have not yet assembled your window frames please refer to steps 5 6 Please note This image is for illu...

Страница 9: ...boards are level and ush with each other as you lay each one 24 25 25 22 20 20 24 25 25 22 20 20 Rubber Mallet may be required to t parts Step 13 Parts Needed No 20 QTY 12 No 22 QTY 6 No 24 QTY 6 No...

Страница 10: ...boards are level and ush with each other as you lay each one Pre drill hole 70mm screw 17 18 Rubber Mallet may be required to t parts Step 15 Parts Needed No 17 QTY 1 No 18 QTY 1 No 17 18 Ensure that...

Страница 11: ...mm Screws a b IMPORTANT Pre drill before xing screws 26 b Rubber Mallet may be required to t parts 40mm screw Pre drill hole Cut to t Step 17 Parts needed No 32 QTY 56 No 32 No 38 Ensuretheroofboardsm...

Страница 12: ...product Nevertheless the process of xing the eaves frames is the same 18x30mm Screws IMPORTANT Pre drill before xing screws 7 13 Pre drill hole 30mm screw Step 19 Parts Needed No 7 QTY 1 No 13 QTY 2 O...

Страница 13: ...ase Note Ensure to screw through each of the oor boards into the oor bearers 208 x 40mm Screws IMPORTANT Pre drill before xing screws Pre drill hole 30mm screw Step 20 Parts Needed No 14 QTY 1 No 15 Q...

Страница 14: ...the internal space 36x30mm Screws Roof Roof IMPORTANT Pre drill before xing screws 23 23 35 35 30mm screw Pre drill hole Cut to t Step 23 Parts needed No 35 QTY 5 No 35 internally Do NOT x the closur...

Страница 15: ...70mm screw Pre drill hole IMPORTANT Pre drill before xing screws Pre drill hole 40mm screw 29 29 28 28 28 28 IMPORTANT Pre drill before xing screws Step 26 Parts Needed No 28 QTY 4 No 29 QTY 2 No s 28...

Страница 16: ...rm braces are secured at the highest point possible on each side Storm braces will help your building expand and contract properly Important Ensure each bolt is tightened using a washer so as not to d...

Отзывы: