background image

P 10

Please retain product label and instructions for future reference

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

Step 17

Parts Needed - No. 13 QTY 4

                                 No. 14 QTY 2

Align the fascias (

No’s. 13 

& 14

) with the roof and 

fix into place using 3x40mm

screws per fascia, making sure

to screw through the 

fascia into the roof purlins

and eaves frame.

*Ensure the angled cuts meet

at the top of the apex.

18x40mm Screws

Pre drill 

hole

40mm 

screw

Pre drill 

hole

60mm 

bolt

Step 18

Parts needed - No. 19 QTY 8

Arrange the storm braces (

No. 19

)

around the building (

internally

). 

Place 2x storm braces per side 

fixing into place using 2x 60mm 

bolts per brace making sure the 

washer & nut are tightened from 

the outside of the building.

*Ensure the storm braces are

secured at the highest point

possible on each side.

**Storm braces will help your

building expand and contract

properly.

***Important: Ensure each

bolt is tightened using a 

washer so as not to damage 

the log boards.

16x60mm Bolt Sets

14

14

13

13

13

13

19

19

Содержание 0619LOG016-V4

Страница 1: ...outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to all sides for maintenance work and annual treatment Ensure the base is level and is built on firm ground to prevent distortion Refer ...

Страница 2: ...x110x2996mm QTY 1 LB19RG110 A 2996 Log Board 19x120x2500mm QTY 20 LB19 A 2500 Log Board 19x120x875mm QTY 36 LB19 B 875 Roof Purlin 40x90x3000mm QTY 3 F4090 3000 Eaves Frame 27x44x3000mm QTY 2 F2744 3000 Fascia 16x120x1347mm QTY 4 S16120 1347 Fascia 16x120x3028mm QTY 2 S16120 3028 Bearer 44x44x2308mm QTY 2 F4444 2308 PT Bearer 44x44x2716mm QTY 8 F4444 2716 PT Roof Board 16x121x1344mm QTY 54 MB16 C ...

Страница 3: ... P 3 Please retain product label and instructions for future reference 60mm Bolt Set x16 Pre assembly Please note Each board interlocks at either end in a staggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves ...

Страница 4: ...PORTANT Pre drill before fixing screws IMPORTANT Pre drill before fixing screws Pre drill hole 70mm screw a Step 1 Parts Needed No 15 QTY 2 No 16 QTY 8 Lay the bearers No s 15 16 onto a firm and level surface free from areas where standing water can collect as shown in the illustration Fix the framing together at each corner using 8x70mm screws ensuring the frame is flush 8x70mm Screws Pre drill h...

Страница 5: ...future reference 6 7 5 Step 3 Parts Needed No 5 QTY 12 No 6 QTY 12 No 7 QTY 6 No 9 QTY 6 No 10 QTY 12 Following the same method outlined in Pre Assembly lay the first 6 boards No s 5 6 7 9 10 onto the starter boards to create your first level Ensure that the boards are level and flush with each other as you lay each one 5 9 10 10 6 7 5 Step 5 Parts Needed No 5 QTY 10 No 6 QTY 10 No 7 QTY 5 No 9 QT...

Страница 6: ... 16 No 7 QTY 7 No 9 QTY 6 No 10 QTY 16 Following the same method outlined in Pre Assembly lay the remaining boards No s 5 6 7 9 10 onto the assembly to bring the board level to the top of the window and door frames Ensure that the boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame 7 Step 7 Parts Needed No 8 QTY 1 No 21 QTY...

Страница 7: ...ds are flush to the end of the roof purlin Once in position fix to each purlin using 3x40mm screws Due to natural occurences of wood shrinkage expansion You may be required to use the provided spac ers and place a space of 2mm to ensure every roof board lines up with the truss Ensure the roof boards meet at the top of the apex and leave an over hang at the bottom Continue adding the roof boards al...

Страница 8: ... the log board on one side Continue adding the floor boards internally making sure to interlock each individual board DoNOTsecure the boards until the last board has been measured and cut Following the same method outlined previously measure the gap between the bottom of the tongue on the last board placed and the log board Using a straight edge mark out the measurement onto the last floor board N...

Страница 9: ...ep 14 Parts needed No 20 QTY 5 Once the floor has been laid arrange the closure trim No 20 around the outside edge of floor internally measure and cut down accordingly to best match the internal space Secure each trim section into place using 6x30mm spaced equally along the board as shown in the illustration Do NOT fix the closure trim to the floor boards 30x30mm Screws Roof Roof Please retain pro...

Страница 10: ...at the top of the apex 18x40mm Screws Pre drill hole 40mm screw Pre drill hole 60mm bolt Step 18 Parts needed No 19 QTY 8 Arrange the storm braces No 19 around the building internally Place 2x storm braces per side fixing into place using 2x 60mm bolts per brace making sure the washer nut are tightened from the outside of the building Ensure the storm braces are secured at the highest point possib...

Отзывы: