P 10
Please retain product label and instructions for future reference
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
Step 17
Parts Needed - No. 13 QTY 4
No. 14 QTY 2
Align the fascias (
No’s. 13
& 14
) with the roof and
fix into place using 3x40mm
screws per fascia, making sure
to screw through the
fascia into the roof purlins
and eaves frame.
*Ensure the angled cuts meet
at the top of the apex.
18x40mm Screws
Pre drill
hole
40mm
screw
Pre drill
hole
60mm
bolt
Step 18
Parts needed - No. 19 QTY 8
Arrange the storm braces (
No. 19
)
around the building (
internally
).
Place 2x storm braces per side
fixing into place using 2x 60mm
bolts per brace making sure the
washer & nut are tightened from
the outside of the building.
*Ensure the storm braces are
secured at the highest point
possible on each side.
**Storm braces will help your
building expand and contract
properly.
***Important: Ensure each
bolt is tightened using a
washer so as not to damage
the log boards.
16x60mm Bolt Sets
14
14
13
13
13
13
19
19