background image

P 9

Please retain product label and instructions for future reference

             

HANDLE

WITH CARE

1

2

3

4

Felt 

tacks 

Step 17

Parts needed - No. 21

Cut the felt into three strips and lay 

onto the roof in the order shown in 

the illustration.

*Ensure there is approximately 

50mm of overhanging felt each 

side.

Once the felt is laid out fix to the 

roof using felt tacks at 100mm

intervals.

*Felt size: 2124mm

88x Felt Tacks

1.

2.

3.

Closure Trim

Internal

23

*Measure and cut the

closure trims to

fit the internal space.

23

23

Closure Trim

Internal

12

*Measure and cut the

closure trims to

fit the internal space.

12

12

Pre drill 

hole

30mm 

screw

*

trim to fit

Step 15

Parts needed - No. 12 QTY 4 

   

 

Inside the building place the closure 

trim (No. 12) against the boarding 

and align with the roof as shown in 

the illustration, ensuring the angled 

face follows the roof line. 

Once in position fix each trim 

into place by pre drilling a pilot hole 

and using 6x30mm screws per trim, 

equally spacing them along the face 

of the board.

24x30mm Screws

30mm 

screw

Pre drill 

hole

*

Cut to fit

Step 16

Parts needed - No. 12 QTY 4 

Once the floor has been laid arrange the

closure trim (No. 12) around the outside 

edge of floor (internally), measure and cut 

down accordingly to best match the 

internal space.

Secure each trim section into place using 

6x30mm spaced equally along the board 

as shown in the illustration.

*Do NOT fix the closure trim to the floor

boards.

24x30mm Screws

 

Roof

Roof

Содержание 0619LOG001-V4

Страница 1: ...ine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to all sides...

Страница 2: ...mm QTY 6 LB19 B 1370 Log Board 19x120x310mm QTY 30 LB19 B 310 Log Board 19x120x310mm QTY 12 LB19 C 310 Log Board 19x120x2500mm QTY 19 LB19 A 2500 Log Board 19x120x2000mm QTY 38 LB19 A 2000 Log Board 1...

Страница 3: ...60mm Bolt Set x16 P 3 Please retain product label and instructions for future reference Pre assembly Please note Each board interlocks at either end in a staggered pattern Before securing ensure that...

Страница 4: ...led base frame along the longest sides Ensure the notches at either end of each board are flush and level with the ends of the frame Fix each of the starter boards to the frame by screwing through the...

Страница 5: ...the boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame by 12 13 boards refer to door installation instructions if not you ca...

Страница 6: ...er boards and rest on to the longer board Ensure the boards are level with each end Please note This image is for illustrative purposes and may differ from your choice in product regarding window posi...

Страница 7: ...TY 38 Place the first two roof board s No 15 onto the assembly on each side making sure the boards are flush to the end of the roof purlin Once in position fix to each purlin using 3x40mm screws Ensur...

Страница 8: ...oor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Following the same method outlined previously measure the g...

Страница 9: ...crew trim to fit Step 15 Parts needed No 12 QTY 4 Inside the building place the closure trim No 12 against the boarding and align with the roof as shown in the illustration ensuring the angled face fo...

Страница 10: ...40mm Screws Pre drill hole 40mm screw 14 14 14 14 IMPORTANT Pre drill before fixing screws 19 19 Pre drill hole 60mm bolt Step 19 Parts needed No 19 QTY 8 Arrange the storm braces No 19 around the bui...

Отзывы: