background image

P 5

Please retain product label and instructions for future reference

             

Step 3

Parts Needed - No. 5 QTY 6

                                 No. 6 QTY 6

                                 No. 8 QTY 6

                                 No. 9 QTY 12

Following the same method

outlined in 

Pre-Assembly

, lay

the first 6 boards (No’s. 5, 6

8 & 9) onto the starter boards 

to create your first level.

*Ensure that the boards are

level and flush with each

other as you lay each one.

Step 5

Parts Needed - No. 6 QTY 12

 

 

   No. 7 QTY 6

                                 No. 8 QTY 6

                                 No. 9 QTY 12

Following the same method

outlined in 

Pre-Assembly

, lay

the next 6 boards (No’s. 6, 7, 

8 & 9) onto the assembly to 

create your second level.

*Ensure that the boards are

level and flush with each

other as you lay each one.

*Doors can be hung once the 

boarding has enclosed the 

door frame by 12-13 boards, 

refer to door installation 

instructions, if not, you can 

install the door at step 7.

9

9

5

6

8

9

6

6

7

9

8

Step 4

Once you have laid 6 log boards (

off 

of the starter

) up the door section, 

slide the assembled door frame (No. 

2) over the boards resting the frame 

on top of the starter board.

*Please note:

 This image is for illustra-

tive purposes and may differ from 

your choice in product (

regarding 

door position

). Nevertheless the 

process of fitting the door frame is 

the same.

**Please Note: 

The short boards at 

the

front of the building (either side of 

the door and window opening’s) can 

be placed either side depending on 

your needs.

Содержание 0619LOG001-V4

Страница 1: ...ine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to all sides...

Страница 2: ...mm QTY 6 LB19 B 1370 Log Board 19x120x310mm QTY 30 LB19 B 310 Log Board 19x120x310mm QTY 12 LB19 C 310 Log Board 19x120x2500mm QTY 19 LB19 A 2500 Log Board 19x120x2000mm QTY 38 LB19 A 2000 Log Board 1...

Страница 3: ...60mm Bolt Set x16 P 3 Please retain product label and instructions for future reference Pre assembly Please note Each board interlocks at either end in a staggered pattern Before securing ensure that...

Страница 4: ...led base frame along the longest sides Ensure the notches at either end of each board are flush and level with the ends of the frame Fix each of the starter boards to the frame by screwing through the...

Страница 5: ...the boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame by 12 13 boards refer to door installation instructions if not you ca...

Страница 6: ...er boards and rest on to the longer board Ensure the boards are level with each end Please note This image is for illustrative purposes and may differ from your choice in product regarding window posi...

Страница 7: ...TY 38 Place the first two roof board s No 15 onto the assembly on each side making sure the boards are flush to the end of the roof purlin Once in position fix to each purlin using 3x40mm screws Ensur...

Страница 8: ...oor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Following the same method outlined previously measure the g...

Страница 9: ...crew trim to fit Step 15 Parts needed No 12 QTY 4 Inside the building place the closure trim No 12 against the boarding and align with the roof as shown in the illustration ensuring the angled face fo...

Страница 10: ...40mm Screws Pre drill hole 40mm screw 14 14 14 14 IMPORTANT Pre drill before fixing screws 19 19 Pre drill hole 60mm bolt Step 19 Parts needed No 19 QTY 8 Arrange the storm braces No 19 around the bui...

Отзывы: