P 5
Please retain product label and instructions for future reference
Step 8
Once the roof is fixed and the build-
ing is square, secure the building to
the floor using 50mm screws in
alignment with the floor bearers
across the back panel
(No.4)
and side
gables
(No.1 and No.2)
12x 50mm Screws
50mm
screw
Pre drill
hole
a
a
a
a
a
a
a
a
a
a
a
a
a
a
1
2
3
4
HANDLE
WITH CARE
13
Step 9
Lay Sheet of Felt
(No.13)
onto Roof
(No.7)
as shown in the diagram
ensuring there is a 50mm overhang
around the sides. Fix using
Felt Tacks
at 100mm intervals.
80 x Felt Tacks
Parts Needed- No.13 QTY 1
Felt
tacks
Содержание 05DTMBPN0503DD-V1
Страница 7: ...P 7 2 1 3 4...
Страница 8: ...P 8 1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...