P 3
Pre Assembly
Before assembling remove the transportation
blocks from the bottom of each panel.
Take care removing the blocks as to not damage
the panels. Tap with a flat headed screwdriver
and hammer.
Dispose of the blocks once removed.
Step 1
Place floor
(No. 6)
on a firm
and level base, ensure base
has suitable drainage free
from areas where standing
water can collect. (see front
page on base requirements).
Parts Needed- No.6 QTY 1
Please retain product label and instructions for future reference
Do not secure the building to the floor
until the roof is fitted.
Place the Right Gable
(No.1)
and the Plain
Panel Back
(No.4)
onto the floor.
Fix the corners with 50mm screws as shown
in diagram.
Position the panels so there is equal spacing
between the floor and cladding on all 4 sides
Step 2
3x50mm Screws
Pre drill
hole
50mm
screw
6
4
1
Parts Needed- No.1 QTY 1, No.4 QTY 1
Step 3
7x50mm Screws
Place the Left Gable
(No.2)
onto the floor and
fix to the Plain Panel Pack using 3x50mm
screws.
Line the Plain Panel Front
(No.5)
up to the top
of the two gables and fix using 2x50mm
screws, screwing through the Plain Panel
Front into the two gables.
Pre drill
hole
50mm
screw
5
2
Parts Needed- No.2 QTY 1, No.5 QTY 1
Do not secure the building to the floor
until the roof is fitted.
Position the panels so there is equal spacing
between the floor and cladding on all 4 sides