P 8
29
Please retain product label and instructions for future reference
Step 22
Place the Door support Bar(No.29)
to the inside of the door panel as
displayed in the pictures.
This framing will meet at each
side panel as show in image 2.
The 44mm side of the framing
should sit against the inside of
the door panel, matching the
width of the door frame timber.
*Ensure that the framing is
attched in a straight line match-
ing the line of the top of the door
frame.
*Please be aware this piece of
framing may need to be adjusted
to length by customer in regards
of building tolerances. This piece
of framing should fit tightly
between the two side panels.
Step 23
Screw through the side panel exter-
nally in line with the 2 x 1 framing
using 2 x 70mm screw in either side
to secure the framing in place.
Screw through the front panel
externally with 4 x 70mm screws
equally spaced a part along the door
frame to secure the 2 x 1 framing to
the panel.
*Please ensure you pre-drill prior to
screwing into the panel to eliminate
the chances of the timber splitting.
6x70mm screws
Drill 3 x 6mm holes into the
2 x 1 framing in line with your
barrell bolts. These will act as
the catch for the barrell bolts at
the top of your door.
* Ensure the holes are drilled in
to the 2 x 1 framing attached in
step 15 as oppose to the door
frame.
A
70mm
screw
Hand Saw
Pre drill
hole
BEFORE
AFTER