background image

Do not secure the building 
to the floor until the roof is 
fitted. Fix the panels onto 
the floor using 50mm 
screws in alignment with 
the floor joists

20x50mm screws

Step 7

First position the 

Roof bar

 in 

the centre of the building 
between the back corner and 
door gable. Ensure the top face 
of the support is level with the 
top of the building and the 
mark position below the 
framing for the fittings.

Using the marked position, align 
the 

roof support block

 and fix 

using 2x50mm screws.

At the front, secure the

 support 

bar

 into position using the 

L’ 

Bracket

 and 4x30mm screws

2x50mm screws

4x30mm screws

Roof support must be 

level with top of framing

5

6

11

Step 8

Layout the 

roof 

panels and 

position them as shown in the 
diagram, then secure the panels 
as shown with 6x50mm screws.

Ensure the roof panels are level.

P7

P8

6x50mm screws

Step 9

Place both roof sections on top 
of building, ensure roof 
framing slots over each side 
equally all the way around.

Fix  roof sheets into position 
using 40mm screws ensuring 
that they line up with the 
vertical framing inside the 
building and along the length 
of the internal roof support 
bar.

*It is recommended 
to cut the felt sheets 
before fixing the roof 
to building.

20x40mm screws

Step 10

Отзывы: