Do not secure the building
to the floor until the roof is
fitted. Fix the panels onto
the floor using 50mm
screws in alignment with
the floor joists
20x50mm screws
Step 7
First position the
Roof bar
in
the centre of the building
between the back corner and
door gable. Ensure the top face
of the support is level with the
top of the building and the
mark position below the
framing for the fittings.
Using the marked position, align
the
roof support block
and fix
using 2x50mm screws.
At the front, secure the
support
bar
into position using the
L’
Bracket
and 4x30mm screws
2x50mm screws
4x30mm screws
Roof support must be
level with top of framing
5
6
11
Step 8
Layout the
roof
panels and
position them as shown in the
diagram, then secure the panels
as shown with 6x50mm screws.
Ensure the roof panels are level.
P7
P8
6x50mm screws
Step 9
Place both roof sections on top
of building, ensure roof
framing slots over each side
equally all the way around.
Fix roof sheets into position
using 40mm screws ensuring
that they line up with the
vertical framing inside the
building and along the length
of the internal roof support
bar.
*It is recommended
to cut the felt sheets
before fixing the roof
to building.
20x40mm screws
Step 10