P 5
Please retain product label and instructions for future reference
Step 5
Following the same method outlined
in step 3, place the assembled door
panel onto the floor inbetween the
gables.
Fix the panels together at the
corners using 3x50mm screws
per side.
Do
NOT secure the building to
the floor until the roof is fitted.
6x50mm Screws
a
b
Pre drill
hole
50mm
screw
a
b
b
b
b
b
b
b
a
a
a
a
a
a
1
a
9
10
9
b
40mm
screw
Pre drill
hole
80mm
screw
Step 6
Place the first ridge bar
(No.9)
inside the building and line up with
the upright framing on each gable.
Align the back edge of the ridge bar
with the top of thegable. Once in
place mark the position on both sides
with a pencil.
Place the roof support block
(No. 10)
to the pencil mark and secure in place
using 2x40mm screws per block.
*Repeat this process on both sides
with the remaining roof support bars.
Place the ridge bar(s) on top of
the attached blocks and secure
through the outside of both gables
using 2x80mm screws per side.
12x40mm Screws
12x80mm Screws
a
b
*Hint:
When fitting the roof bar pencil mark the centre
of the roof support bar and follow down onto the gable
at a right angle, this will give you a guide to fix the
support bars in place.