P 4
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Please retain product label and instructions for future reference
30mm
screw
Pre drill
hole
Fix the door bar
(No. 20)
to
the inside of the slave door using
6x30mm screws as shown in the
illustration.
Fit the door beading
(No. 14)
to
the inside of the door frame using
8x30mm screws, ensuring that
they sit flush with the frame and
the door.
Attach the tower bolts
(No.27)
to the door bar using
12x30mm screws.
26x30mm screws
Step 2 Continued...
20
14
14
27
d
e
e
d
Step 3
Place the back panels (No.4) and the
right gable (No. 2)onto the floor.
Fix the panels together
at the corners using 3x50mm
screws.
Do
NOT secure the building to
the floor until the roof is fitted.
6x50mm Screws
a
b
Pre drill
hole
50mm
screw
a
b
a
b
b
b
b
b
b
b
2
4
a
a
a
a
a
a
a
b
b
b
Step 4
Following the same method outlined
in step 3, place the left gable (No. 3)
onto the floor against the back panel.
Fix the two panels together
at the corners using 3x50mm
screws.
Do
NOT secure the building to
the floor until the roof is fitted.
3x50mm Screws
a
b
Pre drill
hole
50mm
screw
3
Содержание 03HEL1008DDFW-V3
Страница 10: ... 2 1 3 4 ...
Страница 11: ... 1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE ...