Please retain product label and instructions for future reference
P 8
It is ESSENTIAL that you apply wood treat-
ment immediately after the building has
been assembled.
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back
Step 19
Parts needed - No. 20 QTY 4
No. 21 QTY 2
No. 22 QTY 1
Fit the fascias
(No.20, No.21 &
No.22)
to the building over the
felt and secure in place with
3x40mm screws per cover trim.
Make sure the fascias at the back
of the building fit lower than the
roof height to allow water to run
off.
21x40mm Screws
40mm
screw
Pre drill
hole
20
20
20
20
21
22
21
Pre drill
hole
50mm
screw
Fix the rain guards
(No.28)
above the
door and both sets of windows,
securing in place using 3x50mm
screws per guard, ensuring to screw
through the framing.
9x50mm Screws
Step 20
Parts Needed -
No.28 QTY 3
28
28
28
Содержание 03DTSHCR0909FGD4TW-V1
Страница 9: ...2 1 3 4...
Страница 10: ...1 2...