P 3
Please retain product label and instructions for future reference
Pre Assembly
Before assembling remove the transportation
blocks from the bottom of each panel.
Take care removing the blocks as to not damage
the panels. Tap with a flat headed screwdriver
and hammer.
Dispose of the blocks once removed.
4
Step 1
Parts needed - No 4 QTY 1
Place the floor
(No.4)
onto a firm
and level base. Ensure the base has
suitable drainage and is free from
areas where standing water can
collect.
Pre drill
hole
25mm
screw
Step 2
Parts needed - No 1 QTY 1
- No 21 QTY 2
- No 25 QTY 2
Lay the Door Gable onto a flat surface with the
framing facing down.
Place the plastic window cill
(No.21)
onto the
external lip of the Door Gable
(No.1)
. Fix the
Cill to the door gable framing using 2x25mm
screws per cill.
Lay the Styrene
(No.25)
into the window
openings so that it overlaps the surrounding
framing equally on both sides as per the
diagram
4x25mm Screws
25
25
21
21
Side View
Styrene
Window Cill
Cladding
Pre drill
hole
30mm
screw
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
16
16
16
16
1
Step 3
Parts needed - No 15 QTY 2
- No 16 QTY 4
Attach the Window Strips
(No.15 and
No.16)
using 30mm screws as per the
diagram. Ensure the strip does not
protrude the width of the window
frame.
Ensure you screw into the window
strips though to the framing, avoiding
the Styrene where possible
18x30mm Screws
15
15
Содержание 03DTSHAX0705HGD2MW-V1
Страница 14: ...P 9 1 2...
Страница 15: ...P 9 2 1 3 4...