P 12
P 8
17
10
10
Fix the fascias
(No.10)
to the
building using 3x40mm screws
per fascia, ensuring the screws go
through to the roof framing
Fix the Shed Diamond
(No.17)
onto the fascias using 2x40mm
screws per finial
16x40mm Screws
Pre drill
hole
40mm
screw
10
17
10
Step 17a
Parts needed - No 10 QTY 4
- No 17 QTY 2
10
17
10
IMPORTANT:
Pre-drill before fixing screws.
Attach the Door Handles
(No.19)
to the
doors using 25mm bolts included with
the door handle.
Pre drill a hole approximately 3mm and
fix the handle from the inside with the
provided bolts
Attach the two turn buttons
(No.24)
above the master door at the top and
bottom using 2x30mm screws.
*These turn buttons help to keep your
doors straight during high & low levels
of moisture content in the air.
2x30mm Screws
4x35mm Bolt
Pre drill
hole
35mm
bolt
Step 18a
Parts needed - No 19 QTY 2
- No 24 QTY 2
19
19
24
24
30mm
screws
24
19
IMPORTANT:
Pre-drill before fixing screws.
Step 19a
Parts needed - No 11 QTY 2
- No 12 QTY 1
12
11
11
11
12
On the inside of the building fix
the Door Frame Strips
(No.11 &
12)
, to the top and sides of the
doors frames. Make sure that the
edges are flush with the edge of
the framing. Fix with 4x30mm
screws per strip.
12x30mm Screws
Pre drill
hole
30mm
screw
Pre drill
hole
25mm
screw
10mm
screw
IMPORTANT:
Pre-drill before fixing screws.
Step 20a
Parts needed - No 23 QTY 1
- No 26 QTY 2
Secure the barrel bolts
(No.26)
to the top
& bottom of the secondary door using
4x10mm screws.
Attach the press lock
(No.23)
to the
master door with 4x25mm screws, aligning
the barrel with the key hole.
*Ensure the key turns and locks properly
before fixing to the door.
8x10mm Screws
4x25mm Screws
26
23
Please retain product label and instructions for future reference
Содержание 03DTSHAX0705HGD2MW-V1
Страница 14: ...P 9 1 2...
Страница 15: ...P 9 2 1 3 4...