background image

P 12

             

P 8

             

17

10

10

Fix the fascias 

(No.10) 

to the 

building using 3x40mm screws 

per fascia, ensuring the screws go 

through to the roof framing

Fix the Shed Diamond

 (No.17) 

onto the fascias using 2x40mm 

screws per finial 

16x40mm Screws

Pre drill 

hole

40mm 

screw

10

17

10

Step 17a

Parts needed - No 10 QTY 4

- No 17 QTY 2

10

17

10

IMPORTANT: 

Pre-drill before fixing screws.

Attach the Door Handles 

(No.19) 

to the 

doors using 25mm bolts included with 

the door handle.

Pre drill a hole approximately 3mm and 

fix the handle from the inside with the 

provided bolts

Attach the two turn buttons 

(No.24)

 

above the master door at the top and 

bottom using 2x30mm screws.

*These turn buttons help to keep your 

doors straight during high & low levels 

of moisture content in the air.

2x30mm Screws

4x35mm Bolt

Pre drill 

hole

35mm   

bolt 

Step 18a

Parts needed - No 19 QTY 2

- No 24 QTY 2

19

19

24

24

30mm 

screws

24

19

IMPORTANT: 

Pre-drill before fixing screws.

Step 19a

Parts needed - No 11 QTY 2

  

 

     - No 12 QTY 1

12

11

11

11

12

On the inside of the building fix 

the Door Frame Strips  

(No.11 & 

12)

, to the top and sides of the  

doors frames.  Make sure that the 

edges are flush with the edge of 

the framing. Fix with 4x30mm 

screws per strip. 

 

12x30mm Screws

Pre drill 

hole

30mm 

screw

Pre drill 

hole

25mm 

screw

10mm 

screw

IMPORTANT: 

Pre-drill before fixing screws.

Step 20a

Parts needed - No 23 QTY 1

  

 

 - No 26 QTY 2

Secure the barrel bolts

 (No.26)

 to the top 

& bottom of the secondary door using 

4x10mm screws.

Attach the press lock 

(No.23) 

to the 

master door with 4x25mm screws, aligning 

the barrel with the key hole. 

*Ensure the key turns and locks properly 

before fixing to the door.

8x10mm Screws

4x25mm Screws

26

23

Please retain product label and instructions for future reference

             

Содержание 03DTSHAX0705HGD2MW-V1

Страница 1: ...avoid placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditio...

Страница 2: ...0 1710mm 10 Fascias 12x60x1227mm QTY 4 S1260 1227mm 11 Door Cover trims 12x40x1740mm QTY 2 S1240 1740mm 29 Veranda Floor QTY 1 AI R11STVF2066X457 V1 27 Roof QTY 2 AI S11MBOHAR465X1250 V1 28 Railing QT...

Страница 3: ...th the framing facing down Place the plastic window cill No 21 onto the external lip of the Door Gable No 1 Fix the Cill to the door gable framing using 2x25mm screws per cill Lay the Styrene No 25 in...

Страница 4: ...e illustration making sure the gable sits inside the plain panel 3x50mm Screws a a a a 5 2 a 6 7 Please retain product label and instructions for future reference a a Pre drill hole 50mm screw IMPORTA...

Страница 5: ...of the apex as shown in the diagram From the top fix directly through the roof panels No 3 into the ridge bar No 8 below using 5x60mm screws per roof panel It is essential that the ridge bar No 8 and...

Страница 6: ...50mm screw Secure the building to the floor internally using 28x50mm screws Ensure to screw through the framing into the floor bearers 28x50mm Screws b b b Cut down trims to fit Pre drill hole 30mm sc...

Страница 7: ...o the fascias using 2x40mm screws per finial 16x40mm Screws Pre drill hole 40mm screw Step 13 Parts needed No 10 QTY 4 No 17 QTY 2 17 IMPORTANT Pre drill before fixing screws 10 10 17 10 10 Attach the...

Страница 8: ...screw Pre drill hole 25mm screw 10mm screw IMPORTANT Pre drill before fixing screws Step 16 Parts needed No 23 QTY 1 No 26 QTY 2 Secure the barrel bolts No 26 to the top bottom of the secondary door u...

Страница 9: ...ing sure the framing in the roof panels sits firmly within the Gables No 1 2 and on top of the Ridge Bar No 8 Make sure that you have got the roof panels the correct way round with the recess at the t...

Страница 10: ...ing into the floor bearers 28x50mm Screws b b b IMPORTANT Pre drill before fixing screws Cut down trims to fit Pre drill hole 30mm screw Step 12a Parts needed No 9 QTY 4 No 13 QTY 2 No 14 QTY 2 Attach...

Страница 11: ...e frame flush to edge of the railing No 29 Secure to the railing No 29 and to the roof No 3 using 3x40mm screws per frame Ensure the framing follows the same direction as the roof 6x40mm Screws 30 30...

Страница 12: ...Screws 4x35mm Bolt Pre drill hole 35mm bolt Step 18a Parts needed No 19 QTY 2 No 24 QTY 2 19 19 24 24 30mm screws 24 19 IMPORTANT Pre drill before fixing screws Step 19a Parts needed No 11 QTY 2 No 12...

Страница 13: ...u apply wood treat ment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Please retain product label and instr...

Страница 14: ...P 9 1 2...

Страница 15: ...P 9 2 1 3 4...

Отзывы: