background image

P 3

Please retain product label and instructions for future reference

             

Pre Assembly
Position press lock on the door 

align with key hole and fix into 

position using 4 x 10mm screws.

Then fit barrel bolts to top and 

bottom of the door as shown in 

diagram. Use 4x10mm screws 

per barrel bolt.

Ensure doors open and close 

freely.

Pre drill 

hole

4x16mm Black Screws
8x10mm Screws

10mm 

screw

Pre drill 

hole

16mm 

screw

Drill a hole in the framing 

above and below the door 

for the tower bolt to fix 

into.

Pre drill holes then fix Chrome 

Handle using 35mm coach screw 

as shown in diagram.

Pre drill 

hole

35mm

bolt

24

22

26

4x35mm Bolt

Step 1

Place the floor on a

firm and level base,

ensure the base has

suitable drainage, 

free from areas

where standing water

can collect.

Pre drill 

hole

60mm 

screw

Step 2

Fix the window panels and the 
door panel with 6x60mm 
screws as shown in the 
diagram.

6x60mm Screws 

2

2

1

Содержание 03COR0707-V3

Страница 1: ...e must be taken to ensure the product is placed on a suitable base BUILDING A BASE When thinking about where the building and base is going to be constructed Ensure that there will be access to all si...

Страница 2: ...ssembly please make sure you have a suitable base ready to erect your building MADE IN GREAT BRITAIN 22 Barrel Bolt QTY 2 23 Butt hinge QTY 6 24 Door Handle QTY 2 25 Turn Button QTY 2 26 Press Lock 27...

Страница 3: ...ck Screws 8x10mm Screws 10mm screw Pre drill hole 16mm screw Drill a hole in the framing above and below the door for the tower bolt to fix into Pre drill holes then fix Chrome Handle using 35mm coach...

Страница 4: ...crews P 4 Please retain product label and instructions for future reference 4 21 Step 3 Place rear panel left against the floor and the window side Fix into place using 3x50mm screws as shown in the d...

Страница 5: ...ng 3x40mm screws per cover trim 12x40mm Screws 40mm screw Pre drill hole 1 2 3 50mm 50mm 50mm 3 0 2 0 m m 1 0 0 0 m m 1 4 2 0 m m 5 0 m m Step 9 Cut three strips from roll of felt 2x3020mm and 1x1420m...

Страница 6: ...17 18 16 Step 12 Attach the two turn buttons to the slave door using 2x16mm black screws These turn buttons help to keep your doors straight during high and low levels of moisture content in the air...

Страница 7: ...apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Please retain product label and instruct...

Отзывы: