Mercia Garden Products 02PLM0404-V2-PEFC Скачать руководство пользователя страница 5

Please retain product label and instructions for future reference

             

Please retain product label and instructions for future reference

             

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

www.merciagardenproducts.co.uk      P5

Step 5

Parts needed -     

Place the Ridge Bar

 (No. 9)

 between 

the front and back panels. Ensure the 

framing sits on top of the central 

upright on both gables as shown in 

diagram.

Secure it in place with 1x30mm screw 

through each end.

2x30mm screws. 

Step 6

Parts needed -          x2 &           x2

 

Fix an Eaves Frame 

(No. 10)

 

to each Roof Sheet

 (No. 6)

 using 

4x30mm screws per eave.

 

Position the Roof Sheets on 

the building ensuring that the roof 

sheet sits flush with the building at 

the back.

Fix using 8x40mm screws per sheet.

24x30mm screws. 

Step 8  

Cut the felt into 2 sheets of 1266mm 

and lay onto the roof as shown in the 

diagram ensuring there is a 50mm 

overhang around the sides.

60 x Felt Tacks. 

Step 7  

Fix the panels to the floor using 

3x50mm screws per panel. 

Ensure there are equal gaps 

between the floor and the 

cladding. 

12x50mm screws. 

30mm 

screw

9

9

6

10

6

30mm 

screw

10

6

A

A

B

B

50mm 

screw

Felt 

tacks 

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

Содержание 02PLM0404-V2-PEFC

Страница 1: ...rd surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be slightly smaller than the external measurement of the building i e The cladding should overlap the base creating a run off for water It is also recommended that the floor be at least 25mm above the surroundin...

Страница 2: ...eading Block QTY x12 5 Door Gable AI 02PLM0404 V1DG Plain Gable AI 02PLM0404 V1PG QTY x2 Window Side AI 02PLM0404 V1WS Door AI 02PLM0404 V1D 6 7 8 Floor Sheet OSB9 1110X1170mm QTY x2 Roof Sheet OSB8 1142X645mm QTY x3 Window Styrene STY2 405x394mm QTY x3 Window Cross PI 04 0013 9 10 Ridge Bar 28x28x1118mm Eaves Frame 28x28x1142mm Floor Joist 28x28x1110mm 11 12 Fascia 40x12x639mm FS2828 1118mm FS282...

Страница 3: ... co uk P3 Pre Assembly Before assembling remove the transportation blocks from the bottom of each panel Take care removing the blocks as to not damage the panels Tap with a flat headed screwdriver and hammer Dispose of the blocks once removed 30mm Screw x 68 50mm Screw x 28 60mm Screw x 2 40mm Screw x 15 Felt Tacks x 60 10mm Screw x 4 30mm Black Screw x 16 Nail Bag ...

Страница 4: ...No 5 with an even space between each one Position the joists flush on both sides of the floor sheet and mark the centres of joists onto either end Fix using 4x30mm screws per joist Place the floor on your firm and level base ensure base has suitable drainage free from areas where standing water can collect See front page on base requirements 16x30mm screws Step 3 Parts needed Attach the Plain Gabl...

Страница 5: ... 10 to each Roof Sheet No 6 using 4x30mm screws per eave Position the Roof Sheets on the building ensuring that the roof sheet sits flush with the building at the back Fix using 8x40mm screws per sheet 24x30mm screws Step 8 Cut the felt into 2 sheets of 1266mm and lay onto the roof as shown in the diagram ensuring there is a 50mm overhang around the sides 60 x Felt Tacks Step 7 Fix the panels to t...

Страница 6: ...etween the fascia and building 12x40mm Screws 13 12 40mm screw 17 7 8 Step 10 Parts needed x3 x3 x12 7 8 Place the Styrene No 7 in each window aperture ensuring you remove the film from both sides of the styrene before fitting Then place the Window Cross No 8 over the top of the styrene To fix the styrene and window cross in place fix a Beading Block No 17 centrally to the framing above below to t...

Страница 7: ...rill hole It is ESSENTIAL that you apply wood treat ment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Playhouse Maintenance It is recommended that the following checks and maintenance are carried out at the begin ning of each season as well as at regular intervals during the usage season Check all nuts bo...

Отзывы: