Mercia Garden Products 02PLM0404-V2-PEFC Скачать руководство пользователя страница 2

02PLM0404-V1

Overall Dimensions:

Width = 1277mm 

Depth = 1166mm 

Height = 1137mm

Base Dimensions: 

Width = 1170mm 

Depth = 1110mm 

Please retain product label and instructions for future reference

           

Before assembly  

please make sure you have a 

suitable base ready to erect your 

building 

 

MADE IN GREAT BRITAIN

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

www.merciagardenproducts.co.uk      P2

2

1

3

4

15

Finial

SHED DIAMOND FINIAL

QTY x2

14

Wooden Door Handle

PI-04-0024

17

16

Hinge

PI-07-0113

QTY x2

PI-07-0011

Beading Block

QTY x12

5

Door Gable

AI-02PLM0404-V1DG

Plain Gable

AI-02PLM0404-V1PG

QTY x2

Window Side

AI-02PLM0404-V1WS

Door

AI-02PLM0404-V1D

6

7

8

Floor Sheet

OSB9-1110X1170mm

QTY x2

Roof Sheet

OSB8-1142X645mm

QTY x3

Window Styrene

STY2-405x394mm

QTY x3

Window Cross

PI-04-0013

9

10

Ridge Bar - 28x28x1118mm 

Eaves Frame - 28x28x1142mm 

Floor Joist - 28x28x1110mm 

11

12

Fascia - 40x12x639mm

FS2828-1118mm

FS28288-1142mm 

QTY x2

FS2828-1110mm 

QTY x4

SI240-639 

QTY x4

13

Door Flower 

PI-04-0016

1!

Look for the symbols and follow the safety guidlines below.

Ensure screw heads 

are subflush and 

sand down any 

splinters created.

Ensure the screws are 

fixed squarely and do 

not protrude.

12mm gap  

surrounding the 

door.

2!

3!

50kg

 

50kg per user

Содержание 02PLM0404-V2-PEFC

Страница 1: ...rd surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be slightly smaller than the external measurement of the building i e The cladding should overlap the base creating a run off for water It is also recommended that the floor be at least 25mm above the surroundin...

Страница 2: ...eading Block QTY x12 5 Door Gable AI 02PLM0404 V1DG Plain Gable AI 02PLM0404 V1PG QTY x2 Window Side AI 02PLM0404 V1WS Door AI 02PLM0404 V1D 6 7 8 Floor Sheet OSB9 1110X1170mm QTY x2 Roof Sheet OSB8 1142X645mm QTY x3 Window Styrene STY2 405x394mm QTY x3 Window Cross PI 04 0013 9 10 Ridge Bar 28x28x1118mm Eaves Frame 28x28x1142mm Floor Joist 28x28x1110mm 11 12 Fascia 40x12x639mm FS2828 1118mm FS282...

Страница 3: ... co uk P3 Pre Assembly Before assembling remove the transportation blocks from the bottom of each panel Take care removing the blocks as to not damage the panels Tap with a flat headed screwdriver and hammer Dispose of the blocks once removed 30mm Screw x 68 50mm Screw x 28 60mm Screw x 2 40mm Screw x 15 Felt Tacks x 60 10mm Screw x 4 30mm Black Screw x 16 Nail Bag ...

Страница 4: ...No 5 with an even space between each one Position the joists flush on both sides of the floor sheet and mark the centres of joists onto either end Fix using 4x30mm screws per joist Place the floor on your firm and level base ensure base has suitable drainage free from areas where standing water can collect See front page on base requirements 16x30mm screws Step 3 Parts needed Attach the Plain Gabl...

Страница 5: ... 10 to each Roof Sheet No 6 using 4x30mm screws per eave Position the Roof Sheets on the building ensuring that the roof sheet sits flush with the building at the back Fix using 8x40mm screws per sheet 24x30mm screws Step 8 Cut the felt into 2 sheets of 1266mm and lay onto the roof as shown in the diagram ensuring there is a 50mm overhang around the sides 60 x Felt Tacks Step 7 Fix the panels to t...

Страница 6: ...etween the fascia and building 12x40mm Screws 13 12 40mm screw 17 7 8 Step 10 Parts needed x3 x3 x12 7 8 Place the Styrene No 7 in each window aperture ensuring you remove the film from both sides of the styrene before fitting Then place the Window Cross No 8 over the top of the styrene To fix the styrene and window cross in place fix a Beading Block No 17 centrally to the framing above below to t...

Страница 7: ...rill hole It is ESSENTIAL that you apply wood treat ment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Playhouse Maintenance It is recommended that the following checks and maintenance are carried out at the begin ning of each season as well as at regular intervals during the usage season Check all nuts bo...

Отзывы: