background image

Step 11

Remove the film from both sides of the door styrene

before fitting the window bars.

 

Place one piece of short beading in the top 

 

groove and push into the far corner. 

 

Repeat with a second piece of short beading 

 

and fit into the opposite corner of the lower 

 

groove. Fit the longer window bar into the top 

 

and bottom groove by using a circular motion. 

 

The bar must be central.

 

Place the remaining beading into the grooves 

 

and secure using 30mm screws. You may want 

 

to place a piece of card on top of the styrene to 

 

help avoid any potential scratching.

 

Place the remaining window bar onto  the 

 

window bar already fitted ensuring that 

 

the fit is central. Fix the window bars together 

 

using 1x20mm screw, ensuring not to damage 

 

the styrene glazing. Pre drill to avoid splitting.

1x20mm Screws

12x30mm Screws   

Pre drill 

hole

20mm 

screw

30mm 

screw

Step 12

 

Place a window cross against the

 

inside of each window. Position

 

the cross centrally to the window

 

and fix into place using 4x20mm

 

screws per cross.

 

Attach the wooden handle to the

 

front of the door, screwing into

 

the mid rail.

 

Secure the ply triangle to the

 

inside of the door opening (on

 

the opposite side to the hinges)

 

using 3x20mm screws.

11x20mm Screws

   

Pre drill 

hole

20mm 

screw

a

b

c

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

P 5

Please retain product label and instructions for future reference

             

B

eading

Beading

Beading

Beading

a

b

c

a

b

c

a

b

c

20

15

18

Отзывы: