Step 11
Remove the film from both sides of the door styrene
before fitting the window bars.
Place one piece of short beading in the top
groove and push into the far corner.
Repeat with a second piece of short beading
and fit into the opposite corner of the lower
groove. Fit the longer window bar into the top
and bottom groove by using a circular motion.
The bar must be central.
Place the remaining beading into the grooves
and secure using 30mm screws. You may want
to place a piece of card on top of the styrene to
help avoid any potential scratching.
Place the remaining window bar onto the
window bar already fitted ensuring that
the fit is central. Fix the window bars together
using 1x20mm screw, ensuring not to damage
the styrene glazing. Pre drill to avoid splitting.
1x20mm Screws
12x30mm Screws
Pre drill
hole
20mm
screw
30mm
screw
Step 12
Place a window cross against the
inside of each window. Position
the cross centrally to the window
and fix into place using 4x20mm
screws per cross.
Attach the wooden handle to the
front of the door, screwing into
the mid rail.
Secure the ply triangle to the
inside of the door opening (on
the opposite side to the hinges)
using 3x20mm screws.
11x20mm Screws
Pre drill
hole
20mm
screw
a
b
c
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back
P 5
Please retain product label and instructions for future reference
B
eading
Beading
Beading
Beading
a
b
c
a
b
c
a
b
c
20
15
18