background image

a

b

a

b

b

b

b

2

3

Step 3

Place the first gable and plain panel onto

the floor.

 

Fix the panels at the corners  using 

 

3x50mm screws.

 

Do NOT secure the building to the 

 

floor until the roof is fitted.

3x50mm Screws   

a

b

Pre drill 

hole

50mm 

screw

a

a

a

a

a

a

a

a

a

b

b

b

b

b

Step 4

Place the second gable and the assembled

door panel onto the floor.

 

Fix the panels at the corners  using 

 

9x50mm screws.

 

Do NOT secure the building to the 

 

floor until the roof is fitted.

9x50mm Screws   

a

b

Pre drill 

hole

50mm 

screw

Step 5

 

Attach the “L” brackets to each end

 

of the ridge bar, ensuring the backs

 

are flush with the edge of the framing,

 

using 2x20mm screws per bracket.

 

Fix the assembled ridge bar to both

 

gables centrally with 2x30mm 

 

screws per side.

4x20mm Screws

4x30mm Screws   

a

b

a

b

Pre drill 

hole

20mm 

screw

30mm 

screw

19

7

6

8

Step 6

Fix 1x eaves frame to each roof sheet

using 3x30mm screws per eave.

Place the roof sheets on to the 

assembly, ensuring they meet at the 

top. Secure each roof section to the

building using 24x30mm screws.

30x30mm Screws   

Pre drill 

hole

20mm 

screw

P 3

Please retain product label and instructions for future reference

             

Отзывы: