Mercia Garden Products 02DTTWR6565-V1-PEFC Скачать руководство пользователя страница 5

8

150mm 

screw

Step 1

Parts needed -           &

Place the platform 

(No.1)

 face down 

on a level surface, place the two rear 

posts 

(No.8)

 in the two corners 

shown. Secure with 150mm screws 

directed through the platform into 

the end of the post.

Ensure the platform is supported 

throughout the construction 

process.

4 x 150mm screws

1

1

8

8

1

8

1!

2!

Pre drill 

hole

Step 2

Parts Needed -           &          &

Place a corner brace

 (No.7) 

up against 

the platform 

(No.1) 

and the rear post 

(No.8) 

Ensure that the corner brace is 

sitting from the post and the platform. 

If you do not ensure the correct angle 

the platform may be out of square. 

Once you have the correct angle fix 

the corner brace to the platform and 

the base using a 100mm screw.

2 x 100mm screws

7

100mm 

screw

7

8

7

1

1!

2!

Pre drill 

hole

Step 3

Parts needed

 -      

Measure the distance from the 

edge of the corner brace 

(No.7)

 up 

to the post from both ends, both 

measurments should be the same. 

Make a note of the exact 

measurment and you can then use 

this as a guide for all the corner 

braces.

Pencil mark where the corner 

braces should sit based on the 

measurment already taken.  Fix a 

further three corner braces using 

the same method as above.

6 x 100mm screws

100mm 

screw

7

7

7

7

1!

2!

Pre drill 

hole

Step 4

Part needed

 -           &         & 

Place the front post 

(No.9) 

next to 

the rear post 

(No.8)

 ensuring the 

end sits flush with the platform 

(No.1)

 and make a pencil mark on 

the front post where the rear post 

finishes.

Make sure you do this for both 

front posts.

9

8

1

9

1!

2!

Pre drill 

hole

Please retain product label and instructions for future reference

             

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

www.merciagardenproducts.co.uk      P5

BEFORE YOU START PLEASE READ THE INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed in the parts list provided. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a 

Phillips screwdriver, Flathead screwdriver, Stanley knife, Wood saw, Step ladder, Hammer, Spirit level and 

a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

- Ensure you have enough time to build the product to ensure the building is water tight.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration 

of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may 

also occur during excessive dry spells due to natural processes. Unfortunately, these processes cannot be 

avoided but can be helped. It is suggested that the outdoor building is sprayed with water during 

extended periods of hot weather and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually 

to prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot 

guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a water-

proof treatment to prevent water ingress. Pressure Treated buildings - Require a waterproof treatment to 

prevent water ingress. Log Cabins - Are supplied untreated and require a preservative and waterproofing 

treatment.

We also recommend treating the building prior to construction.

POSITIONING YOUR PLAYHOUSE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual treatment. 

We recommend a 

minimum space of 2m around a playhouse

, away from any structure or obstructions 

such as fences, garages, houses, overhanging branches, washing lines or electrical wires.

It is recommended that the position of the Playhouse is

 not in direct sunlight.

Activity toys such as swings and slides for towers shall not be installed over concrete, asphalt or 

any hard surface.

BUILDING A BASE 

Ensure the base is level and is built on firm ground, to prevent distortion, checking with a spirit level.  

Refer to diagrams for the base dimensions.  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is 

also recommended that the floor be at least 25mm above the surrounding ground level to avoid 

flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

- Wooden base.

Содержание 02DTTWR6565-V1-PEFC

Страница 1: ...trichlorophenol BEFORE YOU START PLEASE READ THE INSTRUCTIONS CAREFULLY Check the pack and make sure you have all the parts listed in the parts list provided When you are ready to start make sure you...

Страница 2: ...er Slide SI 002 001 0024 5x5 Playhouse With Framed Door Tower Slide Swing SI 002 001 0025 02DTSHAX05051W V1 PEFC Playhouse 02DTTWR6565 V1 PEFC Tower 02PATINCSWA V1 PEFC Swing Set 02DTSHAX05051W V1 PEF...

Страница 3: ...ming 100x100x555mm QTY 1 F100100 555mm 12 13 14 11 Small Rail QTY 1 AI 02TCR416X543 V1 Part not required if purchased slide Platform QTY 1 AI 02TB1470X1983 V1 Large Rail QTY 1 AI 02CR1331X543 V1 Ladde...

Страница 4: ...e blocks as to not damage the panels Tap with a flat headed screwdriver and hammer Dispose of the blocks once removed REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE Please retain product...

Страница 5: ...8 7 1 1 2 Pre drill hole Step 3 Parts needed Measure the distance from the edge of the corner brace No 7 up to the post from both ends both measurments should be the same Make a note of the exact mea...

Страница 6: ...e 9 Step 7 Parts needed With some help tip the platform No 1 round to the other side Place the remaining front post No 9 within the cut out on the platfrom make sure the pencil mark lines up with the...

Страница 7: ...u can now continue to finish the tower This particular playhouse has been used for illusrtation purposes Step 10 Parts needed Place the large rail No 2 between the two front posts No 9 ensuring the fr...

Страница 8: ...block will be fixed wth 2x60mm screws 2x60mm screws 60mm screw 10 10 Step 13 Part Needed Place the ladder between the front post No 9 and the playhouse left hand side rail Ensure the ladder fits flus...

Страница 9: ...ach the slide framing No 13 to the side of the platform with 3x100mm screws level with the top of the platform 3 x 100mm screws 100mm screw Note We recommend applying an impact reducing surface around...

Страница 10: ...required distance between the product and eventual obstacles walls fencing The distance should be minimum 2000mm 8 In this safety area no hard angular or pointed objects should be present The surface...

Страница 11: ...enance are carried out at the beginning of each season as well as at regular intervals during the usage season Check all nuts bolts screws for tightness and tighten when required Check for movement op...

Страница 12: ...2 1 3 4...

Страница 13: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Отзывы: