Mercia Garden Products 01PTOSBA0305SDNW-V1 Скачать руководство пользователя страница 4

Step 4

 

Place the plain gable (

No.3

)   

 

and the assembled door  

 

 

gable (

No.1

) on to the floor    

 

and fix the corners together   

 

using 3x50mm screws per    

 corner.

 

Do not secure the building to  

 

the floor until the roof is  

 

 

secured in place.

*Ensure the door gable is fitted on 

the inside of the plain panel. Screw 

through the door gable framing 

into the framing of the plain panel.

9x50mm screws

Pre drill 

hole

50mm 

screw

Step 5

Place the ridge bar (

No.10

) between 

the plain and door gable. Ensure the 

top corners of the ridge bar sit flush 

with the top point of the gables.

Fix the ridge bar to the the gables 

using an L bracket (

No.12

) and 

4x20mm screws per bracket.

8x20mm screws

Pre drill 

hole

20mm 

screw

Step 6

Fix both eaves frame (

No.9

) to the 

edge of both roof panels (

No.5

taking care to attach the eaves 

frames to the edge of the roof panel 

that matches their lengths. 

Fix the roof sheets to the roof 

ensuring they come together at the 

top using 10x40mm screws per roof 

sheet.

*Ensure to screw the roof sheets 

into the framing of the panels and 

the ridge bar.

24x40mm screws

Pre drill 

hole

40mm 

screw

Step 7

Once the roof has been fully secured 

the building can be fixed to the floor.

Screw down through the framing of 

the panels and into the floor bearers 

using 2x50mm screw for the side 

panels and 3x50mm screws for the 

gables.

10x50mm screws

Pre drill 

hole

50mm 

screw

3

1

5

5

9

5

P 4

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

Please retain product label and instructions for future reference

             

10

12

12

10

12

Содержание 01PTOSBA0305SDNW-V1

Страница 1: ...need to be treated as soon as possible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guaran tee Dip Treated buildings Require a preservative treatment to protect against rot and decay and a waterproof treatment to prevent water ingress Pressure Treated buildings Require a waterproof treatment to prevent water ingress Log Cabins...

Страница 2: ... base ready to erect your building MADE IN GREAT BRITAIN Nail Bag 2 1 3 4 5 6 Door Panel AI 01SHLPDG1410X1894 V1 Door Panel AI 01SHPPG1894X1410 V1 Plain Panel QTY2 AI 01OSBAPS800X1567 V1 Floor AI 01OSBF1460X795 V1 Roof QTY2 OSB8 835X872MM Door AI 01MBDR1600X662 V1 7 9 Cover Trim QTY4 S1245 1560MM 8 Facia QTY4 S1260 851MM Eaves Frame QTY2 F2828 835MM 12 10 Ridge Bar F2828 744MM 11 Diamond Finial QT...

Страница 3: ...fore beginning assembly Each Panel should have two blocks Step 2 Place the floor No 4 on a firm and level base Ensure the base has suitable drainage free from areas where water can collect See front page for base requirments Step 1 Place the door No 6 into the door gable No 1 ensuring an even gap all the way around Secure the hinges No 14 to both the door gable and door using 7x30mm screws per hin...

Страница 4: ... screws per bracket 8x20mm screws Pre drill hole 20mm screw Step 6 Fix both eaves frame No 9 to the edge of both roof panels No 5 taking care to attach the eaves frames to the edge of the roof panel that matches their lengths Fix the roof sheets to the roof ensuring they come together at the top using 10x40mm screws per roof sheet Ensure to screw the roof sheets into the framing of the panels and ...

Страница 5: ...er trims No 7 over the corners and secure in place using 3x30mm screws per cover trim Ensure the cover trims are fitted with the bottom flush to the bottom of the gable boarding 12x30mm screws Pre drill hole 30mm screw Step 10 Attach the facias No 8 to the roof leaving a slight overhang at the top and ensuring the facias meet the eaves frame Attch the shed diamond finial No 11 over the facias cent...

Страница 6: ...ease retain product label and instructions for future reference Step 11 Fit the turn buttons No 13 to the door gable in such a way that the door can be securely held in place It is important to fit these turn buttons as they help to ensure that the door stays in place rather than flexing in moist atmpospheric conditions 2x30mm black screws Pre drill hole 30mm screw 13 ...

Отзывы: