Mercia Garden Products 01PTOSBA0305SDNW-V1 Скачать руководство пользователя страница 3

Step 3

 

Place the plain gable (

No.3

)   

 

and one of the plain panels    

 (

No.2

) on to the floor and fix   

 

the corners together using    

 

3x50mm screws.

 

Do not secure the building to  

 

the floor until the roof is  

 

 

secured in place.

*Ensure the plain gable is fitted on 

the inside of the plain panel. Screw 

through the plain gable framing 

into the framing of the plain panel.

3x50mm screws

Pre Assembly

Remove transportation blocks from 

the bottom of each panel before 

beginning assembly. Each Panel 

should have two blocks.

Step 2

Place the floor (

No.4

) on a firm and 

level base. Ensure the base has 

suitable drainage free from areas 

where water can collect. See front 

page for base requirments.

Step 1

Place the door (

No.6

) into the door 

gable (

No.1

) ensuring an even gap 

all the way around.

Secure the hinges (

No.14

) to both 

the door gable and door using 

7x30mm screws per hinge. Ensure 

the hinges are spaced evenly apart 

from the top and bottom  of the 

door.

14x30mm screws

Pre drill 

hole

50mm 

screw

Pre drill 

hole

30mm 

screw

14

1

6

14

14

3

2

P 3

Please retain product label and instructions for future reference

             

4

Содержание 01PTOSBA0305SDNW-V1

Страница 1: ...need to be treated as soon as possible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guaran tee Dip Treated buildings Require a preservative treatment to protect against rot and decay and a waterproof treatment to prevent water ingress Pressure Treated buildings Require a waterproof treatment to prevent water ingress Log Cabins...

Страница 2: ... base ready to erect your building MADE IN GREAT BRITAIN Nail Bag 2 1 3 4 5 6 Door Panel AI 01SHLPDG1410X1894 V1 Door Panel AI 01SHPPG1894X1410 V1 Plain Panel QTY2 AI 01OSBAPS800X1567 V1 Floor AI 01OSBF1460X795 V1 Roof QTY2 OSB8 835X872MM Door AI 01MBDR1600X662 V1 7 9 Cover Trim QTY4 S1245 1560MM 8 Facia QTY4 S1260 851MM Eaves Frame QTY2 F2828 835MM 12 10 Ridge Bar F2828 744MM 11 Diamond Finial QT...

Страница 3: ...fore beginning assembly Each Panel should have two blocks Step 2 Place the floor No 4 on a firm and level base Ensure the base has suitable drainage free from areas where water can collect See front page for base requirments Step 1 Place the door No 6 into the door gable No 1 ensuring an even gap all the way around Secure the hinges No 14 to both the door gable and door using 7x30mm screws per hin...

Страница 4: ... screws per bracket 8x20mm screws Pre drill hole 20mm screw Step 6 Fix both eaves frame No 9 to the edge of both roof panels No 5 taking care to attach the eaves frames to the edge of the roof panel that matches their lengths Fix the roof sheets to the roof ensuring they come together at the top using 10x40mm screws per roof sheet Ensure to screw the roof sheets into the framing of the panels and ...

Страница 5: ...er trims No 7 over the corners and secure in place using 3x30mm screws per cover trim Ensure the cover trims are fitted with the bottom flush to the bottom of the gable boarding 12x30mm screws Pre drill hole 30mm screw Step 10 Attach the facias No 8 to the roof leaving a slight overhang at the top and ensuring the facias meet the eaves frame Attch the shed diamond finial No 11 over the facias cent...

Страница 6: ...ease retain product label and instructions for future reference Step 11 Fit the turn buttons No 13 to the door gable in such a way that the door can be securely held in place It is important to fit these turn buttons as they help to ensure that the door stays in place rather than flexing in moist atmpospheric conditions 2x30mm black screws Pre drill hole 30mm screw 13 ...

Отзывы: