background image

P 3

Step 1

5

5

10 x 40mm screws

Place floor on firm and level base, ensure 

base has suitable drainage free from areas 

where water can collect. (See front page on 

base requirements). 

Attach the floors using 10 x 40mm screws.

Do not secure the building to the 

floor until the roof is fitted. 

Fix the corners with 50mm screws 

as shown in diagram.

Step 2

3

2

3x50mm Screws

Pre drill 

hole

50mm 

screw

Step 3

9x50mm Screws

Fix the corners with 50mm 

screws as shown in diagram.

1

Pre drill 

hole

50mm 

screw

Use part 3 for a no window 

building and part 4 for a 

windowed building

4 or 3

Step 4

8x20mm Screws

Place the ridge bar in between the door 

and back gables. Ensure the top corners 

of the ridge bar sit flush with the top 

points of the door gable. Fix the ridge bar 

to the gable using one L bracket for each 

end.

Fix with 4x20mm screws each 

16

19

20mm 

screw

Pre drill 

hole