P 5
Please retain product label and instructions for future reference
13
13
12
Step 8
Fix the large trims to the (
gable
) side
and the bottom of the door opening
as shown in the illustration, securing
into place using 3x30mm screws per
trim.
*Measure and cut trims to fit.
attach the small door side trim to the
door side rail with 3x30mm screws.
9x30mm Screws
Pre drill
hole
30mm
screw
*
Cut down
trims to fit
Step 9
Attached 2x butt hinges to each
door, securing at the edge with
3x30mm screws per hinge.
Align each door into the door gap
and secure at either side using
using 3x30mm screws per hinge.
24x30mm Screws
Pre drill
hole
30mm
screw
14
14
Step 10
Secure 1x eaves frame to each roof
sheet, flush to the edge, using
3x30mm screws.
Rest the assembled roof sections
on top of the building and fix into
place with 8x30mm screws per
roof.
22x30mm Screws
a
b
Pre drill
hole
30mm
screw
7
11
a
b
b
b
b
b
b
b
Step 11
Once the roof is fixed secure the
the building to the floor with
15x50mm screws.
*Ensure to screw through the framing
into the floor bearers.
15x50mm Screws
Pre drill
hole
50mm
screw
b