background image

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

P 4

Please retain product label and instructions for future reference

             

9

Step 4

Place the first door frame inbetween

the gable and the front panel and

secure in place using 3x50mm 

screws.

*Ensure to screw through the 

framing into the floor bearers

3x50mm Screws

Pre drill 

hole

50mm 

screw

*The door opening can be positioned

at either side of the building depending

on your needs and preferences.

10

Step 5

Attach the door side rail to the

front panel with 3x50mm screws.

*Ensure the door side rail sits

on top of the bottom framing.

 

3x50mm Screws

Pre drill 

hole

50mm 

screw

*The door opening can be positioned

at either side of the building depending

on your needs and preferences.

a

b

9

26

Step 6

 

Using 2x20mm screws fix the

 

“L” bracket to one end of the

 

remaing door frame.

 

Place the assembled rail onto

 

the side door rail and secure

 

through the top using 1x50mm

 

screw and to the gable (

through 

 

the ”L” bracket

) using 2x30mm

 screws.

2x20mm Screws

2x30mm Screws

1x50mm Screws    

Pre drill 

hole

20mm 

screw

30mm 

screw

50mm 

screw

a

b

Step 7

Place the roof support bar centrally in the

building and secure into place with 2x50mm

screws, fixing through the top rail and the 

back panel.

2x50mm Screws    

Pre drill 

hole

50mm 

screw

8

Содержание 01OBS0406-V1

Страница 1: ...d annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatment to protect against r...

Страница 2: ...Back Panel QTY 2 AI 01PBSBP925X1096 V1 4 Floor QTY 2 AI OSBF1180X950 V1 5 Door QTY 2 AI 01PBSD525X1110 V1 6 Roof QTY 2 PI 03 0324 7 8 Roof Support 28x28x1133mm QTY 1 F2828 1133mm 9 Door Frame 28x28x1...

Страница 3: ...ing water can collect 3x50mm Screws 5 5 Pre drill hole 50mm screw 2 4 4 Step 2 Place the back panels and the right gable onto the floor and secure in place using 6x50mm screws Do not secure to the flo...

Страница 4: ...op of the bottom framing 3x50mm Screws Pre drill hole 50mm screw The door opening can be positioned at either side of the building depending on your needs and preferences a b 9 26 Step 6 Using 2x20mm...

Страница 5: ...or securing at the edge with 3x30mm screws per hinge Align each door into the door gap and secure at either side using using 3x30mm screws per hinge 24x30mm Screws Pre drill hole 30mm screw 14 14 Step...

Страница 6: ...m Felt tacks 17 13 13 13 13 Step 13 Fix the trims to each corner of the building and across the joint at the back securing each trim into place with 3x30mm screws Measure and cut trims to fit 12x30mm...

Страница 7: ...structions for future reference 15 15 a b Step 15 Attach a turn button to the top and bottom of one door depending on which door you wish to be the locking door using 1x30mm black screw per turn butto...

Отзывы: