P 5
Please retain product label and instructions for future reference
Step 7
Parts needed - No. 7 QTY 2
Place the Gable Tops
(No. 7)
central over the
end panels. Make sure that the cladding
slots together and fix into position using
50mm screws.
Fix together using 8x50mm screws
staggering the screws so they don’t collide.
8x50mm Screws
50mm
screw
Pre drill
hole
7
7
Step 6
Parts needed - No. 1, (or 4 QTY 1)
Fix the corner and end of the Door Panel
(No. 1)
(or panel of your choice) to the already
standing chosen panel and 1st Plain Panel
(No. 2)
with 50mm screws as shown in
diagram..
Do not secure the building to the
floor until the roof has been fitted,
Position the panels so there is equal
spacing between the floor and
cladding on all sides.
6x50mm Screws
50mm
screw
Pre drill
hole
1
Step 8
Parts needed - No. 14 QTY 1
No. 18 QTY 2
Place the ridge bar
(No. 14)
in between the
Gable Tops
(No. 8)
in line with the central
framing of the gable tops.
Fix the ridge bar to the gable using one
L bracket
(No. 18)
for each end. Fix with
4x20mm screws each.
8x20mm Screws
20mm
screw
Pre drill
hole
18
14
Содержание 01DTSHRAX0705SDNW-V1
Страница 10: ...2 1 3 4...
Страница 11: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...