P 6
Please retain product label and instructions for future reference
Step 10
Parts needed - No. 15 QTY 1
Cut the felt (
No. 15
) into one sheet and lay
onto the roof as shown in the illustration.
*Ensure there is approximately 50mm of
overhanging felt around the building.
Fix the felt onto the building using 38x felt
tacks at 100mm intervals.
Felt size: 1844mm
38x felt tacks.
HANDLE
WITH CARE
1
2
3
4
Felt
tacks
15
Felt
tacks
15
7
Step 11
Parts needed - No. 7 QTY 4
Fit the cover trims (
No. 7
) over the
corners and secure in place using
3x30mm screws per cover trim.
*Ensure the cover trims are fitted
with the bottom flush to the bottom
of the gable boarding.
12x30mm screws
Pre drill
hole
30mm
screw
7
7
7
Step 12
Parts needed - No. 8 QTY 4
No. 11 QTY 2
Fit the Fascias (
No. 8
) to the roof over
the felt and secure in place with
40mm screws as shown. Pre drill to
avoid splitting.
Followed by adding Finials (
No. 11
)
over the Fascias using x2 40mm
screws per Finial.
12x40mm screws
Pre drill
hole
40mm
screw
8
8
8
8
11
11
Содержание 01DTSHAX0305SDNW-V1
Страница 8: ...2 1 3 4...
Страница 9: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...