P 4
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Please retain product label and instructions for future reference
Step 3
Parts needed - No. 4 QTY 1
Place the Floor
(No. 4)
on a firm and
level base, ensure that the base has
suitable drainage, free from areas
where standing water can collect.
(see front page on base
requirements).
4
Step 4
Parts needed - No. 2 QTY 1
No. 3 QTY 1
Fix the corners of the plain gable (
No. 2
) and
one of the plain panels (
No. 3
) with 3x50mm
screws. as shown in the diagram.
Position the panels so there is equal spacing
between the floor and cladding on all sides.
*Ensure the plain gable is fitted on the inside
of the plain panel. Screw through the plain
gable framing into the framing of the plain
panel.
Do not secure the building to the floor until
the roof is secured in place.
3x50mm screws
Pre drill
hole
50mm
screw
3
2
Step 5
Parts needed - No. 1 QTY 1
No. 3 QTY 1
Fix the corners of the plain panel (
No. 3
)
and the assembled door gable (
No. 1
) with
3x50mm screws per corner.
Position the panels so there is equal
spacing between the floor and cladding on
all sides.
*Ensure the door gable is fitted on the
inside of the plain panel. Screw through
the door gable framing into the framing of
the plain panel.
Do not secure the building to the floor until
the roof is secured in place.
9x50mm screws
Pre drill
hole
50mm
screw
3
1
Step 6
Parts needed - No. 10 QTY 1
No. 12 QTY 2
Place the ridge bar (
No. 10
) between the
gable panels. Also in line with the central
framing within the gable panels.
Fix the ridge bar to the the gables using
one L bracket (
No. 12
) for each end. Fix
with 4x20mm screws per bracket.
8x20mm screws
Pre drill
hole
20mm
screw
10
12
12
10
12
Содержание 01DTSHAX0305SDNW-V1
Страница 8: ...2 1 3 4...
Страница 9: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...