background image

P 5

Please retain product label and instructions for future reference

             

Step 8

Pre drill 

hole

30mm 

screw

24

28

28

14

14

Connect the ridge bars

 (No.14) 

 together 

with the metal “U” 

(No.24) 

channel, using 

10x30mm screws.  Ensure the ridge bar sits 

into the U-channel with equal spacing on 

each side.

Attach the “L” 

(No.28) 

brackets to each end 

of the Ridge support with 2x30mm screws 

per bracket.

*Ensure the bracket are flush with the 

ends of the ridge bar.

14x30mm Screws

Parts Needed -

 

No.14 QTY 2

 

 

 - No.24 QTY 1

 

 

 - No.28 QTY 2 

 

                               

IMPORTANT: 

Pre-drill before fixing screws.

Step 9

Parts needed - No.14 QTY 2

 

 

- No.28 QTY 2

Pre drill 

hole

30mm 

screw

Align the ridge bar 

(No.14)

 

between the gables and secure to 

the central uprights with 2x30mm 

screws per bracket 

(No.28)

, as 

shown in the illustration.

*Ensure the ridge bar is flush with

the top framing of the gable tops.

4x30mm Screws

14

14

28

Step 10

Parts needed - No.7 QTY 2

 

 

- No.15 QTY 4

50mm 

screw

Pre drill 

hole

Fix the Eaves framing 

(No.15)

 to the roof 

(No.7)

 using 5x50mm screws per eaves 

framing, screwing through the eaves framing 

and into the roof framing.

Ensure the eaves framing is flush to the 

edges of the roof framing before securing

20x50mm Screws

7

15

15

7

15

15

Step 11

Parts needed- No.7 QTY 2

Place the Roofs 

(No.7) 

onto the top 

of the building, ensuring the side 

edges are flush with the building 

and there is equal spacing at the 

front and back.

Fix the Roofs together internally, 

using 4x50mm screws in alternating 

sides as shown in the diagram.

4x50mm Screws 

50mm 

screw

Pre drill 

hole

*internal view*

7

7

Содержание 01DTPRMSHPN1206DDOP-V1

Страница 1: ...avoid placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditio...

Страница 2: ...S21SHPGTL1760X342 V1 Framed Window QTY 1 AI FW1000X540 V1 Fascias 12x90x1898mm QTY 2 S1290 1898MM 11 Door Block 27x44x160mm QTY 4 F2744 160MM 12 Ridge Bar 27x70x1715mm QTY 2 F2770 1715MM 13 14 Eaves...

Страница 3: ...floors together using 12x50mm screws through the floor bearers in an alternating pattern Once fixed together turn the floor back the right way up 10x50mm Screws Step 1 Parts needed No 1 QTY 2 SECONDA...

Страница 4: ...t the ends using 3x50mm screws Do not secure the building to the floor until the roof has been fitted Position the panels so there is equal spacing between the floor and cladding on all sides 9x50mm S...

Страница 5: ...d secure to the central uprights with 2x30mm screws per bracket No 28 as shown in the illustration Ensure the ridge bar is flush with the top framing of the gable tops 4x30mm Screws 14 14 28 Step 10 P...

Страница 6: ...ing and into the ridge bar 6x100mm Screws 100mm screw Pre drill hole 26 26 16 17 14 Step 12 7 7 Fix the roofs No 7 to the top of the building ensuring the side edges are flush with the building and th...

Страница 7: ...o 13 QTY 4 No 19 QTY 2 No 26 QTY 2 13 a 26 26 13 25 25 Step 17 Parts needed No 31 QTY 1 Pre drill hole 20mm screw 31 Fix the casement stay No 31 to the window and then align the fixings to the window...

Страница 8: ...0mm Carriage Bolts and Nuts Felt tacks Step 19 Parts needed No 32 QTY 1 No 33 QTY 1 Cut the Felt No 32 and the Capping Felt No 33 in to sheets at 3650mm each Lay onto roof as shown in diagram ensuring...

Страница 9: ...side of the building ensuring they are flush to the top of the building secure using 3x40mm screws per fasica 18x40mm Screws 23 22 22 22 22 23 Pre drill hole 40mm screw It is ESSENTIAL that you apply...

Страница 10: ...2 1 3 4...

Страница 11: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Отзывы: