background image

P 5

Please retain product label and instructions for future reference

             

a

a

Pre drill 

hole

Pre drill 

hole

Step 7

Place the cover strip 13mm above

the gap in the window panel and

fix into place using 3x30mm screws.

*Measure and trim the strip before

fitting.

3x30mm Screws

 

If you would like the widows

 

to open attach the window to

 

the strip using 2x butt hinges.

 

Fix the hinges to the window

 

using 3x16mm screws per

 

hinge and to the strip with

 

3x30mm screws.

6x16mm Screws

6x30mm Screws

 

If you would like the window 

 

to be fixed, secure the window

 

into the gap using 4x30mm

 

screws. Ensure to screw through

 

the window into the panel

 framing.

4x30mm Screws

b

a

10

Opening Window

Fixed Window

30mm 

screw

30mm 

screw

16mm 

screw

30mm 

screw

22

16

Pre drill 

hole

a

b

Pre drill 

hole

50mm           

screw

Step 8

Place floors on a firm and level base, ensure 

base has suitable drainage  free from areas 

where standing water can collect.  (

see front 

page on base requirements

).  

Ensure floors are flush to each other and fix 

using 8x50mm screws. Alternate fixing 

positions along the length of the floors.

*NOTE: The floors do NOT connect by a

tongue and groove fixing.

8x50mm Screws

1

1

1

8

Pre drill 

hole

50mm           

screw

Step 9

Place the assembled plain gable

and first plain side onto the floor 

and fix in place.

 

Fix the corners with 50mm

 screws.

3x50mm Screws

a

Содержание 01DTGRODB0808-V3

Страница 1: ...water during extended periods of warm sunshine and sheltered as much as possible during rain or snow Once your garden building has been installed it will need to be treated as soon as possible and an...

Страница 2: ...45 x 1449mm QTY 1 S1245 1449MM Barge Board 12 x 95 x 691mm QTY 1 S1295 G 691MM Barge Board 12 x 95 x 760mm QTY 2 S1295 G 760MM Fascia Board 12 x 95 x 835mm QTY 4 S1295 G 835MM Fascia Board 12 x 95 x 7...

Страница 3: ...or future reference Step 1 Lay the Door Panel and Gable Top on a level floor place the gable top on top of the door panel ensure they are level at the top then fix together using 60mm screws Stagger t...

Страница 4: ...ds to ensure rigidity 42x30mm screws 30mm screw Pre drill hole 3 4 Step 5 Lay the plain back panel and the remaining gable top on a level floor place the gable top on top of the plain back panel ensur...

Страница 5: ...g 4x30mm screws Ensure to screw through the window into the panel framing 4x30mm Screws b a 10 Opening Window Fixed Window 30mm screw 30mm screw 16mm screw 30mm screw 22 16 Pre drill hole a b Pre dril...

Страница 6: ...ng fits into slot at top between the gable top rafters Fix panels into position using 4x30mm screws from the top of panel straight into the rafter Pre drill holes before hand Ensure the larger over ha...

Страница 7: ...3 Step 15 Use 3x30mm screws to fix each cover trim 12x30mm screws Pre drill hole 30mm screw 20 19 Step 16 Fit fascia boards to the front and the back of building using 3x40mm screws per board as shown...

Страница 8: ...aple to the Door Gable or secondary door Making sure the Hasp is in line with the staple and screw into the Door or Master door To lock the Door place the Hasp over the Staple and twist into the lock...

Страница 9: ...el and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and ca...

Страница 10: ...2 1 3 4...

Страница 11: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Отзывы: